1238
SABIC 2025 PO / Contract: RAS.2025.111 Completed

HVAC Platofrm Design for SABIC Headquarter Building/Shapoorji Pallonji

RAS AMBITION

1239
SIPCHEM 2025 PO / Contract: CW13628 Ongoing

SIPCHEM, TECHNICAL MASTER SERVICE AGREEMENT, (Contract No. CW 13629, SAP Agreement No. 4600002241) . 3 Years

1240
UACC 2025 PO / Contract: COC/UACC/0001 Completed

Design and supervison of Sales Gas pipe line for UACC

1241
Saudi Coustom 2025 PO / Contract: NGI-0800002 Completed

38 ware house of Saudi Coustom RFP Design and contractors

Idrees Petrolium, Next Gen Infra, Aljihaz Holding

1242
SABIC 2025 PO / Contract: 4300719542 Ongoing

Design, procurement, and construction of a De-coke Drum, including replacement with REDOX@600 material at the furnace outlet.

SAUDI KAYAN Petrochemical Co.

1243
SATORP 2025 PO / Contract: 4100007037 Completed

Design,Buid and supply, Mataellic Rack Storage 06 units for the refinary operations.

Refinary operations.

1244
MARASI MARINE 2025 PO / Contract: Contract Completed

Design of a 150 kN Bollard Pull Bitt at Jubail Industrial Port for Marasi Marine Shipyard Co.

King Fahd Industrial Port

1245
SIPCHEM 2025 PO / Contract: MISCL-2025-331-1 Ongoing

Engineering Design and BOQ for 110V to 220V Conversion Project 11 Buildings

MULTIFIX

1246
HADEED - RAJHI STEEL 2025 PO / Contract: 1400000032 Ongoing

CG After cooler Chiller Project

Saudi Iron & Steel Company (HADEED)

1247
SATORP 2025 PO / Contract: 4100007068 Completed

Design,Buid and supply, Mataellic Rack Storage 06 units for the refinary operations.

Repeat Order for Refinary operations.

1234
SIPCHEM 2024 PO / Contract: 4500134804 Completed

Flexibility Analysis to replace Ethylene Vertical pump with New Submersible Centrifugal type Pump

1235
ARAMCO 2024 PO / Contract: OG-001/NPCL-IS-OG-GOSP/SA/0379 Completed

MTO Preparation & Bid Estimation Support for 31 GOSP

NESMA

1236
ARAMCO 2024 PO / Contract: OG-001/NPCL-IS-OG-VRU/SA/0398 Completed

MTO Preparation & Bid Estimation Support for 16 Bulk Plants

NESMA

1237
ANC 2024 PO / Contract: ANC-PO-4500062082 Completed

Preparation of Shop Drawings

1211
Taldeen Plastic Solution 2023 PO / Contract: 4800010215 Completed

Electrical LV/MV switchgear servicing, supporting reliable power distribution and system protection.

1212
Rowad Global Packaging Company 2023 PO / Contract: 4800010362 Completed

Cable termination and glanding for LV/MV systems, ensuring secure connections and proper insulation.

1213
Rowad Global Packaging Company 2023 PO / Contract: 4800010477 Completed

CMMS-based maintenance support using Computerized Maintenance Management System for planned and corrective actions.

1214
Rowad Global Packaging Company 2023 PO / Contract: 4800010869 Completed

Fiber optic splicing, termination, and backbone testing, supporting high-speed communication infrastructure and data transmission.

1215
Rowad Global Packaging Company 2023 PO / Contract: 4800012624 Completed

Control panel refurbishment and rewiring, extending panel lifespan and accommodating upgrades.

1216
Technical Tetravalent Lead Smelting Plant 2023 PO / Contract: 4800012457 Completed

Replacement of air filters and belt alignment in AHUs and FCUs, maintaining HVAC performance.

1217
AL Bilad Catalyst 2023 PO / Contract: PO/3/23 Completed

Storm water network Design as per RC requirments and Topographical Survery of Al-Bilad

1218
SIPCHEM 2023 PO / Contract: 4500123234 Completed

Flexibility analysis for new 8# dual flow BFW (Boiler Feed Water) between Phase-1 & Phase-2

1219
Technical Tetravalent Lead Smelting Plant 2023 PO / Contract: 4800011854 Completed

Operational checks of motorized dampers and actuators, ensuring ventilation systems function correctly.

1220
Rassas 2023 PO / Contract: 4800011442 Completed

Deployment and management of network security, firewalls, and cybersecurity compliance systems to protect digital assets.

1221
National Lead Smelting Company 2023 PO / Contract: 4800013874 Completed

Telecom tower and mast installation for wireless coverage, supporting mobile, radio, and network transmission systems.

1222
Technical Tetravalent Lead Smelting Plant 2023 PO / Contract: 4800012987 Completed

Installation of integrated access control systems, providing advanced security features and real-time monitoring of facility entrances.

1223
Rassas 2023 PO / Contract: 4800024056 Completed

Design and installation of structured cabling systems, ensuring that network infrastructures are flexible, scalable, and reliable.

1224
Technical Tetravalent Lead Smelting Plant 2023 PO / Contract: 4800022355 Completed

Data center setup and maintenance, ensuring high availability and reliability of critical IT infrastructure and systems.

1225
SIPCHEM 2023 PO / Contract: 4500123179 Completed

Lightning protection design for IGC plant

1226
SABIC 2023 PO / Contract: 4300577928 Completed

Revamping of Demineralizer Plant -Hadeed

Saudi Iron & Steel Company (HADEED)

1227
SABIC 2023 Completed

Flexibility analysis for Underground Cooling Water Supply and Retrun RTR line JUBAIL AND YANBU

Fiberglass Structural Engineering, Inc.

1228
National Lead Smelting Company 2023 PO / Contract: 4800011423 Completed

Implementation of building automation systems (BMS) for centralized control over HVAC, lighting, and other essential infrastructure.

1229
National Lead Smelting Company 2023 PO / Contract: 4800022865 Completed

Configuration and testing of telecom towers, ensuring optimal signal transmission and connectivity for mobile, radio, and satellite systems.

1230
SABIC 2023 PO / Contract: 4300592691 Completed

LV-591180-2 ASU Condenser Control Valve Performance

AR-RAZI affiliate

1231
MARAFIQ 2023 PO / Contract: 9100026331 Completed

RO-4 Sea Water Desalination Plant Base Line HAZOP

1232
SIPCHEM 2023 PO / Contract: 4500131568 Completed

STRESS ANALYSIS FOR SUCTION/DISCHARGE PIPING OF COMPRESSOR 11-C-2201 IN IDC PLANT

1233
TASNEE 2023 PO / Contract: CW10516 Ongoing

CRANES AND ALLIED SERVICES, 3 Years

1186
TASNEE Downstream 2022 PO / Contract: 9000000962 Completed

Long Term Contract- ARC Contract (3 Years)

1187
National Lead Smelting Company 2022 PO / Contract: 4600022561 Completed

Security system operation and CCTV monitoring, maintaining facility safety through surveillance and access control.

1188
Rassas 2022 PO / Contract: 4600022335 Completed

Thermal scanning and inspection of electrical panels, identifying hotspots and preventing electrical failures.

1189
National Lead Smelting Company 2022 PO / Contract: 4600022009 Completed

Generator operation and preventive maintenance, ensuring backup power systems remain reliable and functional.

1190
Taldeen Plastic Solution 2022 PO / Contract: 4600023112 Completed

Building automation system (BAS) servicing, optimizing control over building utilities and energy efficiency.

1191
Taldeen Plastic Solution 2022 PO / Contract: 4600022681 Completed

Maintenance and cleaning of lighting panels and fixtures, improving illumination and electrical safety.

1192
Taldeen Plastic Solution 2022 PO / Contract: 4600022784 Completed

Lighting automation system servicing, maintaining programmable schedules for energy conservation.

1193
Taldeen Plastic Solution 2022 PO / Contract: 4600023952 Completed

Routine maintenance of access card readers and door locks, ensuring reliable entry control.

1194
NBC (National Batteries Company) 2022 PO / Contract: 4600024521 Completed

IP telephony (VoIP), network switch setup, and configuration, enabling reliable voice and data communication.

1195
Taldeen Plastic Solution 2022 PO / Contract: 4600024142 Completed

Passive Optical LAN (POL) solution deployment, reducing energy use and increasing network efficiency in large facilities.

1196
NBC (National Batteries Company) 2022 PO / Contract: 4600024188 Completed

Installation and optimization of wireless network infrastructure, enabling efficient data transfer and mobility for business operations.

1197
Taldeen Plastic Solution 2022 PO / Contract: 4600024754 Completed

Network security and firewall management, ensuring comprehensive protection against cyber threats and ensuring regulatory compliance.

1198
NBC (National Batteries Company) 2022 PO / Contract: 4600024332 Completed

CCTV camera and NVR system installation, ensuring effective surveillance and secure video storage for monitoring and event analysis.

1199
Rowad Global Packaging Company 2022 PO / Contract: 4600025745 Completed

Setup of fiber optic cable infrastructure for high-speed data transfer, ensuring minimal latency and maximum performance for communication networks.

1200
SIPCHEM 2022 PO / Contract: 4500107423 Completed

Shutdown Manpower Services, East Park

1201
SABIC 2022 PO / Contract: 4300495346 Completed

Water Chillers Supply And Replacement

Saudi Iron & Steel Company (HADEED)

1202
SIPCHEM 2022 PO / Contract: 4500116712 Completed

Civll/Structural Assessment sea water pump foundation (51-P1101A/B)

1203
SIPCHEM 2022 PO / Contract: 4500119607 Completed

Piping Stress Analysis-Re- Boiler Replacement

1204
Rowad Global Packaging Company 2022 PO / Contract: 4600025697 Completed

Installation of point-to-point and point-to-multipoint wireless communication systems, providing flexible and reliable connectivity.

1205
ARAMCO 2022 PO / Contract: AC090WOD2000001 Completed

BOQ Estimation for New substation ADGOSP-3, ADGOPS-6, SHGOSP-1_ ARAMCO

Larsen & Toubro (L&T)

1206
SABIC 2022 PO / Contract: 4300477578 Completed

1EG/1UTL TAM 2022 Rigging Services

Sharq Eastern Petrochemical Company

1207
SABIC 2022 PO / Contract: 4300477573 Completed

3EG/3UTLTAM 2022 Rigging Services

1208
ARAMCO 2022 PO / Contract: PO-PTS-3284-22 Completed

Design and Engineering of Diesel, Gasoline and Spill Container Tank for Marjan and Zulf TCF Project

PT-Steel

1209
SABIC 2022 PO / Contract: 4300430835 Completed

Third party inspection of AlManar Camp

Petrokemya North affiliate

1210
SABIC 2022 PO / Contract: 4300430816 Completed

Third party inspection of AlManar Camp

Petrokemya North affiliate

1140
SIPCHEM 2021 PO / Contract: 4500106633 Completed

Shutdown Manpower Services for IVC Plant

1141
SIPCHEM 2021 PO / Contract: 4500107158 Completed

TAM Manpower Services for EA, IPC, IUC Plants

1142
SABIC 2021 PO / Contract: 4300403835 Completed

Third Party Inspection- COVID 19

Sharq Eastern Petrochemical Company

1143
SABIC 2021 PO / Contract: 4300403816 Completed

Third Party Inspection- COVID 19

1144
SEPC (Saudi Ethylene and Polyethylene Company) 2021 PO / Contract: 4600016412 Completed

RTR/GRP piping repair, testing, and commissioning.

1145
SAPCO (Saudi Acrylic Polymer Company) 2021 PO / Contract: 4600016526 Completed

Valve installation, testing, and stroke calibration.

1146
Saudi Polyolefin Company 2021 PO / Contract: 4600016577 Completed

Structural steel erection and alignment for industrial infrastructure.

1147
Saudi Acrylic Acid Company 2021 PO / Contract: 4600016876 Completed

Cable trench excavation and duct bank installation involving excavation and installation of cable trenches and duct banks.

1148
Saudi Acrylic Acid Company 2021 PO / Contract: 4600016987 Completed

Site development and leveling for plant expansion through grading and site preparation for plant expansion projects.

1149
SAPCO (Saudi Acrylic Polymer Company) 2021 PO / Contract: 4600020193 Completed

DCS/PLC panel installation and termination, including small modifications and upgrades during shutdowns or as part of long-term maintenance contracts.

1150
Saudi Butanol Company 2021 PO / Contract: 4600020265 Completed

Routine inspection and servicing of valves, actuators, and control systems, performed during scheduled shutdowns and plant turnarounds.

1151
Saudi Polyolefin Company 2021 PO / Contract: 4600020555 Completed

Testing and verification of backup systems (e.g., backup DCS/PLC systems and emergency power supply), ensuring readiness during turnarounds.

1152
ARAMCO 2021 PO / Contract: LEAP/COC/22/1031 Completed

Updation of E&I and Telecommunication Drawings for Zulf 450/459 -Larsen & Toubro (L&T)/ARAMCO

Leap Arabia/ Larsen & Toubro (L&T)

1153
ARAMCO 2021 PO / Contract: LEAP/COC/21/4021 Completed

Updation of E&I and Telecommunication Drawings for TANAJIB Gas Plant- ARAMCO

Leap Arabia

1154
ARAMCO 2021 PO / Contract: LEAP/COC/21/4036 Completed

Updation of E&I and Telecommunication Drawings for Marjan GOSP-2 &3 and Zulf GOSP 4- MACDERMOTT - ARAMCO

Leap Arabia/ MACDERMOTT

1155
Saudi Butanol Company 2021 PO / Contract: 4600020621 Completed

Fire alarm system integration with DCS/PLC systems, ensuring immediate alerting and control in emergency situations during shutdowns or turnarounds.

1156
SAPCO (Saudi Acrylic Polymer Company) 2021 PO / Contract: 4600020897 Completed

Fire suppression system installation and commissioning, including sprinklers and clean agent systems, during shutdowns or system upgrades.

1157
EAST GAS 2021 PO / Contract: EGCL/055/2021 Completed

Construction of NG pipeline networks, fiber optic cables and Metering station in Dammam 2nd Industrial City for Arab Paper Manufacturing Company (WARAQ)

1158
Saudi Acrylic Acid Company 2021 PO / Contract: 4600020955 Completed

RTR system pressure testing and documentation, verifying performance under design pressure and ensuring compliance with specifications.

1159
TASNEE 2021 PO / Contract: 4600021066 Completed

Cleaning and servicing of switchgear compartments, improving lifespan and safe operation of electrical equipment.

1160
Rowad Global Packaging Company 2021 PO / Contract: 4600021362 Completed

HVAC system maintenance including chillers, ducting, and package units, ensuring efficient climate control and system performance.

1161
RIG (Rowad International Geosynthetics Company) 2021 PO / Contract: 4600021399 Completed

Busbar system inspection and tightening, maintaining conductivity and reducing the risk of electrical faults.

1162
Advance Petrochemcals 2021 PO / Contract: 4500023381 Completed

TAM Manpower Services

1163
Al JAZEERA 2021 PO / Contract: JAZ/0804/2021 Completed

Detail Design and Engineering for Natural gas line.

1164
SABIC 2021 PO / Contract: 4300415919 Completed

Roof Insulation of TPS Building 1-2-3, SHARQ

Sharq Eastern Petrochemical Company

1165
Technical Tetravalent Lead Smelting Plant 2021 PO / Contract: 4600021459 Completed

Access control system maintenance and programming, ensuring secure and controlled entry to restricted areas.

1166
RIG (Rowad International Geosynthetics Company) 2021 PO / Contract: 4600021487 Completed

BMS schedule and logic tuning, adjusting time-based operations for HVAC and lighting to improve energy efficiency.

1167
RIG (Rowad International Geosynthetics Company) 2021 PO / Contract: 4600021568 Completed

Earthing and lightning protection system inspection, maintaining grounding integrity and safety compliance.

1168
National Lead Smelting Company 2021 PO / Contract: 4600021980 Completed

Maintenance of variable frequency drives (VFDs), ensuring efficient motor control and system reliability.

1169
National Lead Smelting Company 2021 PO / Contract: 4600017896 Completed

Maintenance of public address and voice evacuation systems, ensuring clear communication during emergencies.

1170
RIG (Rowad International Geosynthetics Company) 2021 PO / Contract: 4600018954 Completed

AI-based surveillance and smart site monitoring solutions, ensuring proactive threat detection and real-time analytics.

1171
RIG (Rowad International Geosynthetics Company) 2021 PO / Contract: 4600018231 Completed

Wireless infrastructure setup for point-to-point and point-to-multipoint systems, enabling flexible network expansion.

1172
RIG (Rowad International Geosynthetics Company) 2021 PO / Contract: 4600019254 Completed

Configuration and management of LAN/WAN infrastructure, enabling reliable and secure network operations for businesses of all sizes.

1173
RIG (Rowad International Geosynthetics Company) 2021 PO / Contract: 4600019006 Completed

Deployment of optical fiber infrastructure for high-capacity data transmission, supporting modern communication and technology solutions.

1174
Wison Engineering Ltd. 2021 PO / Contract: WISON-17093-S21-028 Completed

Third Party Inspection- COVID 19

1175
Wison Engineering Ltd. 2021 PO / Contract: WISON-17093-S21-032 Completed

Third Party Inspection- COVID 19 for TCC/KCC/REBA

1176
ARAMCO 2021 PO / Contract: LEAP/COC/21/5246 Completed

Detail Design and Engineering for Telecommunication Cable Routing and Duct bank deisgn for Smart Safety soultion for TANAJIB gas Plant

Leap Arabia

1177
Rassas 2021 PO / Contract: 4600019775 Completed

Wireless network configuration, optimizing data transmission speed and coverage across enterprise and industrial environments.

1178
Taldeen Plastic Solution 2021 PO / Contract: 4600019385 Completed

Satellite and VSAT system installation, providing remote connectivity for global communications and isolated areas.

1179
RIG (Rowad International Geosynthetics Company) 2021 PO / Contract: 4600019019 Completed

Full-scale installation of CCTV, IP cameras, and NVR systems for round-the-clock monitoring and automated event documentation.

1180
SIPCHEM 2021 PO / Contract: 4500110960 Completed

Revalidation of Piping Stress Analysis for PDH Plant

1181
SIPCHEM 2021 PO / Contract: 4500112360 Completed

Piping Stress Analysis-Sulphur Strip Project

1182
JANA 2021 PO / Contract: 4500038798 Completed

Shutdown Manpower Services

1183
SABIC 2021 PO / Contract: PR# 3000218421 Completed

Roof Insulation of TPS Building 1-2-3, SHARQ-Additonal Scope

Sharq Eastern Petrochemical Company

1184
SABIC 2021 PO / Contract: 4300464738 Completed

Wind breaker Maintenance Service Contract (LONG TERM CONTRACT)

Saudi Iron & Steel Company (HADEED)

1185
SABIC 2021 PO / Contract: 4300463266 Completed

Supply Rigger-1 & Rigger-3

Sharq Eastern Petrochemical Company

1084
TASNEE 2020 PO / Contract: 4800016261 Completed

13 Nos. Future Tie In Projects

1085
SABIC 2020 PO / Contract: 4503897545 Completed

Rel. ord. against contract 4600038764 Item 00020

1086
SABIC 2020 PO / Contract: 4801786258 Completed

Third Party Inspection- COVID 19

Ibn Al-Baytar affiliate

1087
SADARA 2020 PO / Contract: 4700002021 Completed

Drain line Project

1088
JANA 2020 PO / Contract: 4500034979 Completed

Preparation of Isometrics Drawings for JANA Pipelines to PORT and other Companies

1089
SAPCO (Saudi Acrylic Polymer Company) 2020 PO / Contract: 4500071658 Completed

Carbon steel utility piping fabrication and installation, including spool and field works.

1090
SEPC (Saudi Ethylene and Polyethylene Company) 2020 PO / Contract: 4500073635 Completed

Fabrication and erection of pipe supports and racks.

1091
Saudi Acrylic Acid Company 2020 PO / Contract: 4500099762 Completed

Mechanical equipment installation for process and utility skids.

1092
SEPC (Saudi Ethylene and Polyethylene Company) 2020 PO / Contract: 4500099763 Completed

Control room and substation building repairs for restoration and repair of control rooms and substation buildings.

1093
SEPC (Saudi Ethylene and Polyethylene Company) 2020 PO / Contract: 4500099806 Completed

Instrumentation cabling and tray installation, ensuring safe routing for field devices and systems during maintenance, shutdown, or upgrades.

1094
EAST GAS 2020 PO / Contract: EGCL/097/2020 Completed

Calibration of transmitters and gauges, ensuring accurate measurement and reliable system performance during plant shutdown and routine calibration checks.

1095
SAPCO (Saudi Acrylic Polymer Company) 2020 PO / Contract: 4500136979 Completed

Instrumentation troubleshooting and fault detection, ensuring smooth plant operations during critical shutdown periods.

1096
SEPC (Saudi Ethylene and Polyethylene Company) 2020 PO / Contract: 4500143868 Completed

System optimization and fine-tuning during plant turnarounds, ensuring all instruments and control systems meet peak performance levels.

1097
Saudi Acrylic Acid Company 2020 PO / Contract: 4500145429 Completed

BMS installation and integration, controlling HVAC, lighting, and other critical systems during maintenance and plant shutdowns.

1098
Saudi Acrylic Acid Company 2020 PO / Contract: 4500145739 Completed

Fire suppression system maintenance, performing regular checks on equipment such as nozzles and valves to ensure reliable operation.

1099
Saudi Butanol Company 2020 PO / Contract: 4500147157 Completed

Laying of underground RTR lines with sand padding, protecting the pipe system and maintaining alignment and stability.

1100
TASNEE 2020 PO / Contract: 4500147857 Completed

Thermal scanning and inspection of electrical panels, identifying hotspots and preventing electrical failures.

1101
Rassas 2020 PO / Contract: 4500151608 Completed

Landscaping and green area maintenance, enhancing environmental aesthetics and compliance with site upkeep standards.

1102
Rassas 2020 PO / Contract: 4500152885 Completed

BMS device connectivity and integration checks, maintaining seamless communication between sensors and control units.

1103
Rassas 2020 PO / Contract: 4500151245 Completed

Replacement of damaged conduits and cable trays, ensuring safe cable routing and support.

1104
Taldeen Plastic Solution 2020 PO / Contract: 4500147944 Completed

Janitorial and sanitation services in industrial zones, maintaining hygiene standards and operational cleanliness.

1105
RIG (Rowad International Geosynthetics Company) 2020 PO / Contract: 4500149490 Completed

Fire detection and suppression system maintenance, ensuring safety compliance and operational readiness.

1106
Technical Tetravalent Lead Smelting Plant 2020 PO / Contract: 4500151011 Completed

Breaker testing and relay calibration in switchgear panels, ensuring protective devices function accurately.

1107
Rowad global packaging 2020 PO / Contract: 4500074620 Completed

Shutdown Manpower Services

1108
FARABI 2020 PO / Contract: TG-2020-00020703-3 Completed

Tank Venting Design Calculations and Nozzle Fabrication drawings for Farabi

TAMIMI

1109
Rassas 2020 PO / Contract: 4500151988 Completed

Inspection and flushing of HVAC chilled water pipelines, preventing blockages and ensuring cooling efficiency.

1110
Rassas 2020 PO / Contract: 4500152753 Completed

Cleaning and inspection of solar panel systems, maintaining energy output and efficiency.

1111
National Lead Smelting Company 2020 PO / Contract: 4500152963 Completed

Satellite and VSAT connectivity setup, enabling remote communication for off-grid or isolated sites.

1112
Technical Tetravalent Lead Smelting Plant 2020 PO / Contract: 4500149596 Completed

Inside Plant (ISP) fiber termination and patch panel management, maintaining organized and efficient fiber infrastructure.

1113
Rassas 2020 PO / Contract: 4500152951 Completed

Design and implementation of secure IP telephony systems, ensuring efficient communication while maintaining robust voice and data security.

1114
National Lead Smelting Company 2020 PO / Contract: 4500147879 Completed

Integration of advanced network monitoring systems, providing real-time analytics and proactive management of network health.

1115
National Lead Smelting Company 2020 PO / Contract: 4500152357 Completed

Public address and general alarm system setup, ensuring clear communication during emergencies and providing real-time alerts to occupants.

1116
JANA 2020 PO / Contract: 4500039465 Completed

Shutdown Manpower Services

1117
SIPCHEM 2020 PO / Contract: 4500105045 Completed

Piping Stress Analysis for Reactor Vent lines

1118
NBC (National Batteries Company) 2020 PO / Contract: 4500152159 Completed

Installation of network firewalls and security protocols to safeguard data transmission and ensure compliance with industry standards.

1119
NBC (National Batteries Company) 2020 PO / Contract: 4500152426 Completed

Access control system maintenance, ensuring continuous monitoring and secure entry points for authorized personnel only.

1120
SABIC 2020 PO / Contract: 4801796011 Completed

Rel. ord. against contract 4600038764 Item 00020 To conduct the audit assessment of the Contractor (Saudi DAZ) camps in Jubail .

SAFCO affiliate

1121
SABIC 2020 PO / Contract: 4801796010 Completed

Rel. ord. against contract 4600038764 Item 00020 To conduct the audit assessment of the Contractor (GISCO) camps in Jubail .

Albayroni Al-Jubail Fertilizer Co

1122
SABIC 2020 PO / Contract: 4801795395 Completed

Rel. ord. against contract 4600038764 Item 00020 Suppliers Names:KANOO, E&H, NABA

IBN ZAHR Saudi European Petrochemical

1123
SABIC 2020 PO / Contract: 4801795139 Completed

Rel. ord. against contract 4600038764 Item 00020, to inspect the construction contractors M/S HKSS Camp at Jubail

Sharq Eastern Petrochemical Company

1124
SABIC 2020 PO / Contract: 4801792358 Completed

Rel. ord. against contract 4600038764 Item 00020, to do inspection for Supplier's accommodation: KNK camp.

SAUDI KAYAN Petrochemical Co.

1125
SABIC 2020 PO / Contract: 5500040116 Completed

Fabrication and installation of equipment-support steel structures.

1126
SABIC 2020 PO / Contract: 5500040342 Completed

Shutdown maintenance of piping, mechanical equipment, electrical systems and field instrumentation.

1127
TASNEE 2020 PO / Contract: 5500040331 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1128
TASNEE 2020 PO / Contract: 5500040288 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1129
TASNEE 2020 PO / Contract: 4500098619 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

1130
TASNEE 2020 PO / Contract: 4500098616 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

1131
TASNEE 2020 PO / Contract: 4500098524 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

1132
TASNEE 2020 PO / Contract: 4500098498 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

1133
TASNEE 2020 PO / Contract: 5500040117 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1134
TASNEE 2020 PO / Contract: 5500039711 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1135
TASNEE 2020 PO / Contract: 4500097830 Completed

Under Three-Year Long-Term ARC Contract at RIG Plant

1136
TASNEE 2020 PO / Contract: 5500039647 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1137
TASNEE 2020 PO / Contract: 5500039586 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1138
TASNEE 2020 PO / Contract: 4500097698 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

1139
TASNEE 2020 PO / Contract: 4500097678 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

656
TASNEE 2019 PO / Contract: CW7748 Completed

Long Term Contract- ARC Contract (3 Years)

657
TASNEE Downstream 2019 PO / Contract: 9000000418 Completed

Long Term Contract- ARC Contract (3 Years)

658
TASNEE 2019 PO / Contract: 5500024580 Completed

PMC Services

659
TASNEE 2019 PO / Contract: 5500018724 Completed

PMC Services

660
TASNEE 2019 PO / Contract: 5500023662 Completed

PMC Services

661
TASNEE 2019 PO / Contract: 5500025270 Completed

Turnaround Manpower services in PDH Plant

662
TASNEE 2019 PO / Contract: 5500011399 Completed

Turnaround Manpower services in PP Plant

663
EAST GAS 2019 PO / Contract: EGCL/114/2019 Completed

Revision Of AS-BUILT System 2019

664
EAST GAS 2019 PO / Contract: EGCL/169/2019 Completed

Primary Metering Station Validation

665
TASNEE 2019 PO / Contract: 4800016171 Completed

As Built for BAP Project , SabTank, tank terminal operator

666
Petrorabigh 2019 PO / Contract: Harycon-PO-EDS-001.019 Completed

Civil & Structural Scope For New Floating Pontoon For Coastal Guard, Petro Rabigh

Harycon

667
EAST GAS 2019 PO / Contract: TPE/016/2019 Completed

Extension of NG pipeline to two new customers (CID #62 and CID#63) and new tapping to existing customer (CID #50)

668
Ma’aden 2019 PO / Contract: GACC-042-247 Completed

Fabrication Drawings of Steel Structure- Maaden Phosphate

NSH(Nasser€¯S.€¯Al€¯Hajri Corporation)

669
Gulf Packaging 2019 PO / Contract: PO-194799 Completed

Site Development of Trio Mada & GPIl

670
Saudi Acrylic Acid Company 2019 PO / Contract: 5500069646 Completed

Pipeline welding, NDT, and QA/QC documentation.

671
Saudi Acrylic Monomer Company 2019 PO / Contract: 5500070181 Completed

Tank fabrication, shell repair, and internal modifications.

672
Saudi Acrylic Monomer Company 2019 PO / Contract: 5500069746 Completed

Asphalt road and pavement repair through repair and resurfacing of asphalt roads and pavements.

673
Saudi Polyolefin Company 2019 PO / Contract: 5500070283 Completed

Concrete repair and epoxy injection works for concrete repairs using epoxy injection to restore structural integrity.

674
Saudi Acrylic Monomer Company 2019 PO / Contract: 5500070421 Completed

Junction box installation and wiring, providing easy access for maintenance, troubleshooting, and upgrades during shutdowns and turnarounds.

675
Saudi Butanol Company 2019 PO / Contract: 5500070456 Completed

Minor equipment modifications and upgrades, improving efficiency, safety, and compliance during plant turnarounds.

676
Saudi Acrylic Monomer Company 2019 PO / Contract: 5500069874 Completed

Fire alarm system installation, commissioning, and testing, ensuring full operational readiness during plant shutdowns and turnarounds.

677
Saudi Polyolefin Company 2019 PO / Contract: 5500069459 Completed

BMS sensor calibration and commissioning, ensuring accurate data input and optimized system operation during startup or shutdowns.

678
Saudi Butanol Company 2019 PO / Contract: 5500069950 Completed

Fire suppression system inspection and testing, ensuring compliance with safety regulations during routine maintenance or shutdowns.

679
SEPC (Saudi Ethylene and Polyethylene Company) 2019 PO / Contract: 5500069523 Completed

RTR joint inspection and holiday testing, ensuring joint integrity and identifying coating defects before commissioning.

680
Saudi Polyolefin Company 2019 PO / Contract: 5500069666 Completed

Electrical LV/MV switchgear servicing, supporting reliable power distribution and system protection.

681
Rowad Global Packaging Company 2019 PO / Contract: 5500069963 Completed

Plumbing and drainage system maintenance, ensuring uninterrupted flow and preventing blockages in facility pipelines.

682
Rassas 2019 PO / Contract: 5500070852 Completed

CMMS-based maintenance support using Computerized Maintenance Management System for planned and corrective actions.

683
National Lead Smelting Company 2019 PO / Contract: 5500070654 Completed

Cleaning and servicing of switchgear compartments, improving lifespan and safe operation of electrical equipment.

684
RIG (Rowad International Geosynthetics Company) 2019 PO / Contract: 5500070987 Completed

Security system operation and CCTV monitoring, maintaining facility safety through surveillance and access control.

685
Technical Tetravalent Lead Smelting Plant 2019 PO / Contract: 5500071745 Completed

Installation and maintenance of structured cabling systems for LAN/WAN and Wi-Fi networks, ensuring reliable connectivity across facilities.

686
Technical Tetravalent Lead Smelting Plant 2019 PO / Contract: 5500071684 Completed

Periodic testing of ELCBs and MCCBs, confirming reliable electrical protection in distribution systems.

687
Rowad Global Packaging Company 2019 PO / Contract: 5500070789 Completed

Servicing of plumbing pumps and control panels, ensuring reliable water supply and drainage.

688
Rowad Global Packaging Company 2019 PO / Contract: 5500071246 Completed

Structured cabling system installation for LAN/WAN/Wi-Fi networks, ensuring seamless connectivity and organized infrastructure.

689
NBC (National Batteries Company) 2019 PO / Contract: 5500071953 Completed

Fiber optic backbone infrastructure design, splicing, and testing, supporting long-distance high-bandwidth transmission.

690
Rowad Global Packaging Company 2019 PO / Contract: 5500072567 Completed

Integration of telecom and IT systems with BMS and smart building platforms, enabling centralized control and automation.

691
Rowad Global Packaging Company 2019 PO / Contract: 5500072322 Completed

Design, deployment, and testing of satellite communication systems, supporting remote locations and ensuring constant connectivity in isolated environments.

692
Taldeen Plastic Solution 2019 PO / Contract: 5500072998 Completed

Access control and door monitoring systems installation, enhancing facility security by regulating entry and tracking personnel movement.

693
RIG (Rowad International Geosynthetics Company) 2019 PO / Contract: 5500072135 Completed

Integration of IP surveillance systems, enabling real-time video monitoring and remote access for enhanced security.

694
Taldeen Plastic Solution 2019 PO / Contract: 5500072885 Completed

Outside plant (OSP) trenching, ducting, and cable laying, providing secure underground and overhead network connections for long-distance data transmission.

695
Taldeen Plastic Solution 2019 PO / Contract: 5500027863 Completed

Repair and sealing of underground concrete pits and water-retaining structures.

696
Taldeen Plastic Solution 2019 PO / Contract: 5500028053 Completed

Installation of prefabricated piping spools, fittings, flanges and valves.

697
Taldeen Plastic Solution 2019 PO / Contract: 5500028109 Completed

Grounding and lightning-protection design for TASNEE substations.

698
Taldeen Plastic Solution 2019 PO / Contract: 5500028419 Completed

Inspection and overhaul of industrial compressors and auxiliary systems.

699
Taldeen Plastic Solution 2019 PO / Contract: 5500028727 Completed

Pipe-to-soil potential surveys and current-interruption testing of cathodically protected pipelines.

700
Taldeen Plastic Solution 2019 PO / Contract: 5500028974 Completed

Repair and refurbishment of valve actuators and positioners.

701
Taldeen Plastic Solution 2019 PO / Contract: 5500029456 Completed

Structural assessment and strengthening of existing industrial platforms.

702
Taldeen Plastic Solution 2019 PO / Contract: 5500029670 Completed

Calibration and functional testing of switches, gauges and transmitters.

703
Taldeen Plastic Solution 2019 PO / Contract: 5500029906 Completed

Mechanical cleaning and descaling of heat-transfer equipment.

704
Taldeen Plastic Solution 2019 PO / Contract: 5500030213 Completed

Installation of cable trays, conduits and underground cable routes.

705
Taldeen Plastic Solution 2019 PO / Contract: 5500030803 Completed

Replacement of corroded pipe shoes, clamps, U-bolts, guides, anchors and structural attachments.

706
Taldeen Plastic Solution 2019 PO / Contract: 5500031127 Completed

Mechanical, electrical and instrumentation maintenance during scheduled shutdowns.

707
Taldeen Plastic Solution 2019 PO / Contract: 5500031289 Completed

Piping rerouting design for process-unit modifications and capacity expansion.

708
Taldeen Plastic Solution 2019 PO / Contract: 5500031486 Completed

Repair of concrete columns, beams, slabs and industrial structures.

709
Taldeen Plastic Solution 2019 PO / Contract: 5500031614 Completed

Positive material identification of alloy piping, valves and equipment.

710
Taldeen Plastic Solution 2019 PO / Contract: 5500031971 Completed

Calibration and verification of tank-level measurement instruments.

711
Taldeen Plastic Solution 2019 PO / Contract: 5500032245 Completed

Installation of stainless-steel piping for chemical and utility services.

712
Taldeen Plastic Solution 2019 PO / Contract: 4500089611 Completed

Maintenance of UPS systems, battery banks and emergency power supplies.

713
Taldeen Plastic Solution 2019 PO / Contract: 5500032769 Completed

Inspection and load verification of constant spring supports and spring hangers.

714
Taldeen Plastic Solution 2019 PO / Contract: 4500090063 Completed

Hydrotesting and leak testing of repaired heat exchangers.

715
Taldeen Plastic Solution 2019 PO / Contract: 5500033082 Completed

Process design for industrial wastewater treatment and reuse systems.

716
Taldeen Plastic Solution 2019 PO / Contract: 4500090381 Completed

Preventive maintenance of fire-and-gas detection systems.

717
Taldeen Plastic Solution 2019 PO / Contract: 5500033437 Completed

Repair of leaking flange joints and replacement of damaged gaskets.

718
Taldeen Plastic Solution 2019 PO / Contract: 5500033836 Completed

Installation and maintenance of lightning-protection systems.

719
Taldeen Plastic Solution 2019 PO / Contract: 5500033862 Completed

Grouting and foundation repair for pumps, motors and rotating equipment.

720
Taldeen Plastic Solution 2019 PO / Contract: 4500091238 Completed

Control-valve sizing and selection for process and utility applications.

721
Taldeen Plastic Solution 2019 PO / Contract: 4500091495 Completed

Modification of pipe racks to accommodate additional process lines.

722
Taldeen Plastic Solution 2019 PO / Contract: 5500034341 Completed

Magnetic-particle and dye-penetrant testing of mechanical components.

723
Taldeen Plastic Solution 2019 PO / Contract: 5500034544 Completed

Replacement of cooling-tower distribution piping and isolation valves.

724
Taldeen Plastic Solution 2019 PO / Contract: 4500092731 Completed

Integration of field instruments with existing PLC and DCS systems.

725
Taldeen Plastic Solution 2019 PO / Contract: 4500093113 Completed

Design of permanent pipe supports, anchors, guides and spring hangers.

726
Taldeen Plastic Solution 2019 PO / Contract: 4500093390 Completed

Replacement of pump bearings, seals, couplings and damaged components.

727
Taldeen Plastic Solution 2019 PO / Contract: 5500035778 Completed

Detailed electrical design for additional process and utility equipment.

728
Taldeen Plastic Solution 2019 PO / Contract: 4500093755 Completed

Repair and replacement of corroded gratings, stair treads and handrails.

729
Taldeen Plastic Solution 2019 PO / Contract: 41005348 Completed

Loop checking and functional testing of field instrumentation.

730
Taldeen Plastic Solution 2019 PO / Contract: 5500036558 Completed

Installation and testing of plant grounding and bonding connections.

731
Taldeen Plastic Solution 2019 PO / Contract: 5500036661 Completed

Installation of equipment-support steel structures.

732
Taldeen Plastic Solution 2019 PO / Contract: 5500036850 Completed

Installation and modification of local control panels and junction boxes.

733
Taldeen Plastic Solution 2019 PO / Contract: 5500037137 Completed

Shutdown inspection, repair, protective coating and reinstatement of critical piping-support systems.

734
Taldeen Plastic Solution 2019 PO / Contract: 5500037341 Completed

Construction of foundations for new process and utility equipment.

735
Taldeen Plastic Solution 2019 PO / Contract: 5500037660 Completed

DCS modification design for process-unit expansion and equipment integration.

736
Taldeen Plastic Solution 2019 PO / Contract: 5500037765 Completed

Earth-resistance testing and rectification of defective grounding systems.

737
Taldeen Plastic Solution 2019 PO / Contract: 5500038049 Completed

Removal and reinstatement of piping insulation and aluminium cladding.

738
Taldeen Plastic Solution 2019 PO / Contract: 5500038167 Completed

Multidisciplinary engineering support for TASNEE plant modifications.

739
Taldeen Plastic Solution 2019 PO / Contract: 5500038611 Completed

Instrumentation design for pressure, temperature, flow and level measurement.

740
Taldeen Plastic Solution 2019 PO / Contract: 5500038915 Completed

Modification and extension of existing motor control centres.

741
Taldeen Plastic Solution 2019 PO / Contract: 5500039079 Completed

Cooling-tower condition assessment and preparation of repair recommendations.

742
Taldeen Plastic Solution 2019 PO / Contract: 5500039133 Completed

PLC and control-panel design for automated pumping and utility systems.

743
Taldeen Plastic Solution 2019 PO / Contract: 5500039273 Completed

Cable sizing, routing and preparation of electrical cable schedules.

744
Taldeen Plastic Solution 2019 PO / Contract: 5500039423 Completed

MCC modification design for additional plant electrical loads.

745
Taldeen Plastic Solution 2019 PO / Contract: 5500039470 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

746
Taldeen Plastic Solution 2019 PO / Contract: 5500039422 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

747
Taldeen Plastic Solution 2019 PO / Contract: 5500039421 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

748
Taldeen Plastic Solution 2019 PO / Contract: 5500039418 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

749
Taldeen Plastic Solution 2019 PO / Contract: 5500039341 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

750
Taldeen Plastic Solution 2019 PO / Contract: 5500039340 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

751
Taldeen Plastic Solution 2019 PO / Contract: 5500039338 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

752
Taldeen Plastic Solution 2019 PO / Contract: 5500039321 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

753
Taldeen Plastic Solution 2019 PO / Contract: 5500039272 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

754
Taldeen Plastic Solution 2019 PO / Contract: 5500039271 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

755
Taldeen Plastic Solution 2019 PO / Contract: 5500039270 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

756
Taldeen Plastic Solution 2019 PO / Contract: 5500039269 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

757
Taldeen Plastic Solution 2019 PO / Contract: 5500039135 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

758
Taldeen Plastic Solution 2019 PO / Contract: 5500039134 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

759
Taldeen Plastic Solution 2019 PO / Contract: 5500039130 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

760
Taldeen Plastic Solution 2019 PO / Contract: 5500039129 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

761
Taldeen Plastic Solution 2019 PO / Contract: 5500039127 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

762
Taldeen Plastic Solution 2019 PO / Contract: 5500039126 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

763
Taldeen Plastic Solution 2019 PO / Contract: 5500039125 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

764
Taldeen Plastic Solution 2019 PO / Contract: 5500039122 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

765
Taldeen Plastic Solution 2019 PO / Contract: 5500039116 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

766
Taldeen Plastic Solution 2019 PO / Contract: 5500039078 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

767
Taldeen Plastic Solution 2019 PO / Contract: 5500038995 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

768
Taldeen Plastic Solution 2019 PO / Contract: 5500038977 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

769
Taldeen Plastic Solution 2019 PO / Contract: 5500038957 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

770
Taldeen Plastic Solution 2019 PO / Contract: 5500038955 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

771
Taldeen Plastic Solution 2019 PO / Contract: 5500038953 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

772
Taldeen Plastic Solution 2019 PO / Contract: 4500096987 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

773
Taldeen Plastic Solution 2019 PO / Contract: 5500038844 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

774
Taldeen Plastic Solution 2019 PO / Contract: 5500038832 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

775
Taldeen Plastic Solution 2019 PO / Contract: 5500038781 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

776
Taldeen Plastic Solution 2019 PO / Contract: 5500038767 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

777
Taldeen Plastic Solution 2019 PO / Contract: 5500038764 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

778
Taldeen Plastic Solution 2019 PO / Contract: 5500038749 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

779
Taldeen Plastic Solution 2019 PO / Contract: 5500038724 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

780
Taldeen Plastic Solution 2019 PO / Contract: 5500038610 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

781
Taldeen Plastic Solution 2019 PO / Contract: 4500096604 Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

782
Taldeen Plastic Solution 2019 PO / Contract: 5500038421 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

783
Taldeen Plastic Solution 2019 PO / Contract: 5500038402 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

784
Taldeen Plastic Solution 2019 PO / Contract: 5500038307 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

785
Taldeen Plastic Solution 2019 PO / Contract: 5500038227 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

786
Taldeen Plastic Solution 2019 PO / Contract: 5500038168 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

787
Taldeen Plastic Solution 2019 PO / Contract: 5500038136 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

788
Taldeen Plastic Solution 2019 PO / Contract: 5500038135 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

789
Taldeen Plastic Solution 2019 PO / Contract: 5500038122 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

790
Taldeen Plastic Solution 2019 PO / Contract: 5500038102 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

791
Taldeen Plastic Solution 2019 PO / Contract: 5500038078 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

792
Taldeen Plastic Solution 2019 PO / Contract: 5500038068 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

793
Taldeen Plastic Solution 2019 PO / Contract: 5500038055 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

794
Taldeen Plastic Solution 2019 PO / Contract: 4500095871 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

795
Taldeen Plastic Solution 2019 PO / Contract: 5500037972 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

796
Taldeen Plastic Solution 2019 PO / Contract: 5500037877 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

797
Taldeen Plastic Solution 2019 PO / Contract: 5500037874 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

798
Taldeen Plastic Solution 2019 PO / Contract: 4500095738 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

799
Taldeen Plastic Solution 2019 PO / Contract: 5500037766 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

800
Taldeen Plastic Solution 2019 PO / Contract: 5500037764 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

801
Taldeen Plastic Solution 2019 PO / Contract: 5500037763 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

802
Taldeen Plastic Solution 2019 PO / Contract: 4500095588 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

803
Taldeen Plastic Solution 2019 PO / Contract: 4500095586 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

804
Taldeen Plastic Solution 2019 PO / Contract: 4500095576 Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

805
Taldeen Plastic Solution 2019 PO / Contract: 5500037703 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

806
Taldeen Plastic Solution 2019 PO / Contract: 5500037694 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

807
Taldeen Plastic Solution 2019 PO / Contract: 5500037645 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

808
Taldeen Plastic Solution 2019 PO / Contract: 5500037584 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

809
Taldeen Plastic Solution 2019 PO / Contract: 5500037567 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

810
Taldeen Plastic Solution 2019 PO / Contract: 5500037539 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

811
Taldeen Plastic Solution 2019 PO / Contract: 4500095353 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

812
Taldeen Plastic Solution 2019 PO / Contract: 5500037380 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

813
Taldeen Plastic Solution 2019 PO / Contract: 4500095158 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

814
Taldeen Plastic Solution 2019 PO / Contract: 4500095114 Completed

Under Three-Year Long-Term ARC Contract at Pipes Plant - Hail

815
Taldeen Plastic Solution 2019 PO / Contract: 5500037305 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

816
Taldeen Plastic Solution 2019 PO / Contract: 5500037276 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

817
Taldeen Plastic Solution 2019 PO / Contract: 4800016171 Completed

Under Three-Year Long-Term ARC Contract at SAAC

818
Taldeen Plastic Solution 2019 PO / Contract: 5500037263 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

819
Taldeen Plastic Solution 2019 PO / Contract: 5500037232 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

820
Taldeen Plastic Solution 2019 PO / Contract: 5500037175 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

821
Taldeen Plastic Solution 2019 PO / Contract: 5500037058 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

822
Taldeen Plastic Solution 2019 PO / Contract: 5500037045 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

823
Taldeen Plastic Solution 2019 PO / Contract: 5500037011 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

824
Taldeen Plastic Solution 2019 PO / Contract: 5500036995 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

825
Taldeen Plastic Solution 2019 PO / Contract: 5500036994 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

826
Taldeen Plastic Solution 2019 PO / Contract: 5500036971 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

827
Taldeen Plastic Solution 2019 PO / Contract: 5500036852 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

828
Taldeen Plastic Solution 2019 PO / Contract: 5500036848 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

829
Taldeen Plastic Solution 2019 PO / Contract: 5500036847 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

830
Taldeen Plastic Solution 2019 PO / Contract: 4500094558 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

831
Taldeen Plastic Solution 2019 PO / Contract: 5500036835 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

832
Taldeen Plastic Solution 2019 PO / Contract: 5500036784 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

833
Taldeen Plastic Solution 2019 PO / Contract: 5500036681 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

834
Taldeen Plastic Solution 2019 PO / Contract: 5500036662 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

835
Taldeen Plastic Solution 2019 PO / Contract: 5500036658 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

836
Taldeen Plastic Solution 2019 PO / Contract: 5500036635 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

837
Taldeen Plastic Solution 2019 PO / Contract: 5500036629 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

838
Taldeen Plastic Solution 2019 PO / Contract: 5500036627 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

839
Taldeen Plastic Solution 2019 PO / Contract: 4500094343 Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

840
Taldeen Plastic Solution 2019 PO / Contract: 5500036560 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

841
Taldeen Plastic Solution 2019 PO / Contract: 5500036559 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

842
Taldeen Plastic Solution 2019 PO / Contract: 5500036557 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

843
Taldeen Plastic Solution 2019 PO / Contract: 5500036510 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

844
Taldeen Plastic Solution 2019 PO / Contract: 5500036509 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

845
Taldeen Plastic Solution 2019 PO / Contract: 4500094190 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

846
Taldeen Plastic Solution 2019 PO / Contract: 5500036481 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

847
Taldeen Plastic Solution 2019 PO / Contract: 5500036466 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

848
Taldeen Plastic Solution 2019 PO / Contract: 5500036366 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

849
Taldeen Plastic Solution 2019 PO / Contract: 5500036306 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

850
Taldeen Plastic Solution 2019 PO / Contract: 5500036260 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

851
Taldeen Plastic Solution 2019 PO / Contract: 5500036228 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

852
Taldeen Plastic Solution 2019 PO / Contract: 5500036210 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

853
Taldeen Plastic Solution 2019 PO / Contract: 5500036208 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

854
Taldeen Plastic Solution 2019 PO / Contract: 4500093826 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

855
Taldeen Plastic Solution 2019 PO / Contract: 5500036060 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

856
Taldeen Plastic Solution 2019 PO / Contract: 5500036043 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

857
Taldeen Plastic Solution 2019 PO / Contract: 4500093673 Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

858
Taldeen Plastic Solution 2019 PO / Contract: 5500035829 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

859
Taldeen Plastic Solution 2019 PO / Contract: 5500035783 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

860
Taldeen Plastic Solution 2019 PO / Contract: 5500035782 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

861
Taldeen Plastic Solution 2019 PO / Contract: 5500035779 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

862
Taldeen Plastic Solution 2019 PO / Contract: 5500035777 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

863
Taldeen Plastic Solution 2019 PO / Contract: 5500035776 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

864
Taldeen Plastic Solution 2019 PO / Contract: 5500035775 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

865
Taldeen Plastic Solution 2019 PO / Contract: 5500035769 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

866
Taldeen Plastic Solution 2019 PO / Contract: 5500035767 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

867
Taldeen Plastic Solution 2019 PO / Contract: 5500035760 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

868
Taldeen Plastic Solution 2019 PO / Contract: 5500035747 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

869
Taldeen Plastic Solution 2019 PO / Contract: 5500035629 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

870
Taldeen Plastic Solution 2019 PO / Contract: 5500035614 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

871
Taldeen Plastic Solution 2019 PO / Contract: 5500035613 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

872
Taldeen Plastic Solution 2019 PO / Contract: 5500035612 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

873
Taldeen Plastic Solution 2019 PO / Contract: 5500035586 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

874
Taldeen Plastic Solution 2019 PO / Contract: 5500035580 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

875
Taldeen Plastic Solution 2019 PO / Contract: 5500035483 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

876
Taldeen Plastic Solution 2019 PO / Contract: 4500093112 Completed

Under Three-Year Long-Term ARC Contract at Pipes Plant - Hail

877
Taldeen Plastic Solution 2019 PO / Contract: 5500035361 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

878
Taldeen Plastic Solution 2019 PO / Contract: 5500035352 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

879
Taldeen Plastic Solution 2019 PO / Contract: 5500035325 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

880
Taldeen Plastic Solution 2019 PO / Contract: 4500092921 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

881
Taldeen Plastic Solution 2019 PO / Contract: 4500092863 Completed

Under Three-Year Long-Term ARC Contract at RGP- BOPP Plant

882
Taldeen Plastic Solution 2019 PO / Contract: 5500035243 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

883
Taldeen Plastic Solution 2019 PO / Contract: 4500092348 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

884
Taldeen Plastic Solution 2019 PO / Contract: 4500092340 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

885
Taldeen Plastic Solution 2019 PO / Contract: 4500092330 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

886
Taldeen Plastic Solution 2019 PO / Contract: 5500034764 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

887
Taldeen Plastic Solution 2019 PO / Contract: 5500034743 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

888
Taldeen Plastic Solution 2019 PO / Contract: 5500034635 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

889
Taldeen Plastic Solution 2019 PO / Contract: 5500034564 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

890
Taldeen Plastic Solution 2019 PO / Contract: 4500092159 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

891
Taldeen Plastic Solution 2019 PO / Contract: 5500034437 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

892
Taldeen Plastic Solution 2019 PO / Contract: 4500091912 Completed

Under Three-Year Long-Term ARC Contract at RGP- BOPP Plant

893
Taldeen Plastic Solution 2019 PO / Contract: 5500034345 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

894
Taldeen Plastic Solution 2019 PO / Contract: 5500034343 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

895
Taldeen Plastic Solution 2019 PO / Contract: 5500034342 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

896
Taldeen Plastic Solution 2019 PO / Contract: 5500034340 Completed

Under Three-Year Long-Term ARC Contract at SAAC

897
Taldeen Plastic Solution 2019 PO / Contract: 5500034339 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

898
Taldeen Plastic Solution 2019 PO / Contract: 5500034338 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

899
Taldeen Plastic Solution 2019 PO / Contract: 5500034238 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

900
Taldeen Plastic Solution 2019 PO / Contract: 5500034162 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

901
Taldeen Plastic Solution 2019 PO / Contract: 4500091674 Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

902
Taldeen Plastic Solution 2019 PO / Contract: 4500091498 Completed

Under Three-Year Long-Term ARC Contract at RGP- BOPP Plant

903
Taldeen Plastic Solution 2019 PO / Contract: 4500091492 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

904
Taldeen Plastic Solution 2019 PO / Contract: 4500091489 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

905
Taldeen Plastic Solution 2019 PO / Contract: 4500091481 Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

906
Taldeen Plastic Solution 2019 PO / Contract: 4500091427 Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

907
Taldeen Plastic Solution 2019 PO / Contract: 4500091406 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

908
Taldeen Plastic Solution 2019 PO / Contract: 4500091400 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

909
Taldeen Plastic Solution 2019 PO / Contract: 5500033958 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

910
Taldeen Plastic Solution 2019 PO / Contract: 4500091207 Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

911
Taldeen Plastic Solution 2019 PO / Contract: 4500091204 Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

912
Taldeen Plastic Solution 2019 PO / Contract: 5500033880 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

913
Taldeen Plastic Solution 2019 PO / Contract: 5500033879 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

914
Taldeen Plastic Solution 2019 PO / Contract: 5500033865 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

915
Taldeen Plastic Solution 2019 PO / Contract: 5500033864 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

916
Taldeen Plastic Solution 2019 PO / Contract: 5500033863 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

917
Taldeen Plastic Solution 2019 PO / Contract: 5500033860 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

918
Taldeen Plastic Solution 2019 PO / Contract: 5500033859 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

919
Taldeen Plastic Solution 2019 PO / Contract: 5500033858 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

920
Taldeen Plastic Solution 2019 PO / Contract: 5500033857 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

921
Taldeen Plastic Solution 2019 PO / Contract: 5500033844 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

922
Taldeen Plastic Solution 2019 PO / Contract: 5500033843 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

923
Taldeen Plastic Solution 2019 PO / Contract: 5500033840 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

924
Taldeen Plastic Solution 2019 PO / Contract: 5500033830 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

925
Taldeen Plastic Solution 2019 PO / Contract: 5500033812 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

926
Taldeen Plastic Solution 2019 PO / Contract: 5500033810 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

927
Taldeen Plastic Solution 2019 PO / Contract: 5500033783 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

928
Taldeen Plastic Solution 2019 PO / Contract: 5500033779 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

929
Taldeen Plastic Solution 2019 PO / Contract: 5500033552 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

930
Taldeen Plastic Solution 2019 PO / Contract: 5500033480 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

931
Taldeen Plastic Solution 2019 PO / Contract: 5500033395 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

932
Taldeen Plastic Solution 2019 PO / Contract: 5500033366 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

933
Taldeen Plastic Solution 2019 PO / Contract: 4500090525 Completed

Under Three-Year Long-Term ARC Contract at RIG Plant

934
Taldeen Plastic Solution 2019 PO / Contract: 4500090472 Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

935
Taldeen Plastic Solution 2019 PO / Contract: 5500033308 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

936
Taldeen Plastic Solution 2019 PO / Contract: 5500033230 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

937
Taldeen Plastic Solution 2019 PO / Contract: 4500090368 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

938
Taldeen Plastic Solution 2019 PO / Contract: 5500033135 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

939
Taldeen Plastic Solution 2019 PO / Contract: 5500033134 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

940
Taldeen Plastic Solution 2019 PO / Contract: 5500033123 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

941
Taldeen Plastic Solution 2019 PO / Contract: 5500033122 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

942
Taldeen Plastic Solution 2019 PO / Contract: 4500090246 Completed

Under Three-Year Long-Term ARC Contract at Pipes Plant - Hail

943
Taldeen Plastic Solution 2019 PO / Contract: 4500090218 Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

944
Taldeen Plastic Solution 2019 PO / Contract: 5500033079 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

945
Taldeen Plastic Solution 2019 PO / Contract: 5500033076 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

946
Taldeen Plastic Solution 2019 PO / Contract: 4500090130 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

947
Taldeen Plastic Solution 2019 PO / Contract: 5500032954 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

948
Taldeen Plastic Solution 2019 PO / Contract: 5500032932 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

949
Taldeen Plastic Solution 2019 PO / Contract: 5500032931 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

950
Taldeen Plastic Solution 2019 PO / Contract: 4500090065 Completed

Under Three-Year Long-Term ARC Contract at RIG Plant

951
Taldeen Plastic Solution 2019 PO / Contract: 5500032869 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

952
Taldeen Plastic Solution 2019 PO / Contract: 5500032862 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

953
Taldeen Plastic Solution 2019 PO / Contract: 5500032838 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

954
Taldeen Plastic Solution 2019 PO / Contract: 5500032821 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

955
Taldeen Plastic Solution 2019 PO / Contract: 4500089977 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

956
Taldeen Plastic Solution 2019 PO / Contract: 5500032786 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

957
Taldeen Plastic Solution 2019 PO / Contract: 5500032771 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

958
Taldeen Plastic Solution 2019 PO / Contract: 4500089808 Completed

Under Three-Year Long-Term ARC Contract at Technical Tetravalent Lead

959
Taldeen Plastic Solution 2019 PO / Contract: 5500032659 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

960
Taldeen Plastic Solution 2019 PO / Contract: 5500032649 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

961
Taldeen Plastic Solution 2019 PO / Contract: 4500089719 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

962
Taldeen Plastic Solution 2019 PO / Contract: 4500089714 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

963
Taldeen Plastic Solution 2019 PO / Contract: 5500032622 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

964
Taldeen Plastic Solution 2019 PO / Contract: 5500032583 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

965
Taldeen Plastic Solution 2019 PO / Contract: 4500089610 Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

966
Taldeen Plastic Solution 2019 PO / Contract: 4500089609 Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

967
Taldeen Plastic Solution 2019 PO / Contract: 5500032472 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

968
Taldeen Plastic Solution 2019 PO / Contract: 5500032468 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

969
Taldeen Plastic Solution 2019 PO / Contract: 5500032467 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

970
Taldeen Plastic Solution 2019 PO / Contract: 5500032382 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

971
Taldeen Plastic Solution 2019 PO / Contract: 5500032287 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

972
Taldeen Plastic Solution 2019 PO / Contract: 5500032103 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

973
Taldeen Plastic Solution 2019 PO / Contract: 5500032090 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

974
Taldeen Plastic Solution 2019 PO / Contract: 5500032083 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

975
Taldeen Plastic Solution 2019 PO / Contract: 5500032081 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

976
Taldeen Plastic Solution 2019 PO / Contract: 5500032005 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

977
Taldeen Plastic Solution 2019 PO / Contract: 5500031975 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

978
Taldeen Plastic Solution 2019 PO / Contract: 5500031974 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

979
Taldeen Plastic Solution 2019 PO / Contract: 5500031968 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

980
Taldeen Plastic Solution 2019 PO / Contract: 5500031920 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

981
Taldeen Plastic Solution 2019 PO / Contract: 5500031836 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

982
Taldeen Plastic Solution 2019 PO / Contract: 5500031752 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

983
Taldeen Plastic Solution 2019 PO / Contract: 4500088245 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

984
Taldeen Plastic Solution 2019 PO / Contract: 4500088158 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

985
Taldeen Plastic Solution 2019 PO / Contract: 5500031610 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

986
Taldeen Plastic Solution 2019 PO / Contract: 5500031609 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

987
Taldeen Plastic Solution 2019 PO / Contract: 5500031608 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

988
Taldeen Plastic Solution 2019 PO / Contract: 5500031570 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

989
Taldeen Plastic Solution 2019 PO / Contract: 5500031551 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

990
Taldeen Plastic Solution 2019 PO / Contract: 5500031538 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

991
Taldeen Plastic Solution 2019 PO / Contract: 5500031497 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

992
Taldeen Plastic Solution 2019 PO / Contract: 5500031477 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

993
Taldeen Plastic Solution 2019 PO / Contract: 5500031462 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

994
Taldeen Plastic Solution 2019 PO / Contract: 5500031456 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

995
Taldeen Plastic Solution 2019 PO / Contract: 5500031453 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

996
Taldeen Plastic Solution 2019 PO / Contract: 5500031404 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

997
Taldeen Plastic Solution 2019 PO / Contract: 5500031302 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

998
Taldeen Plastic Solution 2019 PO / Contract: 5500031301 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

999
Taldeen Plastic Solution 2019 PO / Contract: 4500087462 Completed

Under Three-Year Long-Term ARC Contract at NPIC Plant

1000
Taldeen Plastic Solution 2019 PO / Contract: 5500031218 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1001
Taldeen Plastic Solution 2019 PO / Contract: 5500031206 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1002
Taldeen Plastic Solution 2019 PO / Contract: 5500031203 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1003
Taldeen Plastic Solution 2019 PO / Contract: 5500031187 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1004
Taldeen Plastic Solution 2019 PO / Contract: 5500031183 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

1005
Taldeen Plastic Solution 2019 PO / Contract: 5500031139 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1006
Taldeen Plastic Solution 2019 PO / Contract: 5500031049 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1007
Taldeen Plastic Solution 2019 PO / Contract: 4500086875 Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

1008
Taldeen Plastic Solution 2019 PO / Contract: 5500030877 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1009
Taldeen Plastic Solution 2019 PO / Contract: 5500030861 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1010
Taldeen Plastic Solution 2019 PO / Contract: 5500030825 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

1011
Taldeen Plastic Solution 2019 PO / Contract: 5500030814 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

1012
Taldeen Plastic Solution 2019 PO / Contract: 5500030812 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

1013
Taldeen Plastic Solution 2019 PO / Contract: 5500030671 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

1014
Taldeen Plastic Solution 2019 PO / Contract: 5500030669 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

1015
Taldeen Plastic Solution 2019 PO / Contract: 5500030302 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

1016
Taldeen Plastic Solution 2019 PO / Contract: 4500086269 Completed

Under Three-Year Long-Term ARC Contract at NPIC Plant

1017
Taldeen Plastic Solution 2019 PO / Contract: 5500030281 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1018
Taldeen Plastic Solution 2019 PO / Contract: 5500030245 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

1019
Taldeen Plastic Solution 2019 PO / Contract: 5500030217 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1020
Taldeen Plastic Solution 2019 PO / Contract: 5500030132 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1021
Taldeen Plastic Solution 2019 PO / Contract: 5500030078 Completed

Under Three-Year Long-Term ARC Contract at SAAC

1022
Taldeen Plastic Solution 2019 PO / Contract: 5500030038 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

1023
Taldeen Plastic Solution 2019 PO / Contract: 5500030024 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1024
Taldeen Plastic Solution 2019 PO / Contract: 5500029953 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1025
Taldeen Plastic Solution 2019 PO / Contract: 5500029924 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

1026
Taldeen Plastic Solution 2019 PO / Contract: 5500029898 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

1027
Taldeen Plastic Solution 2019 PO / Contract: 5500029870 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1028
Taldeen Plastic Solution 2019 PO / Contract: 5500029855 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1029
Taldeen Plastic Solution 2019 PO / Contract: 5500029748 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1030
Taldeen Plastic Solution 2019 PO / Contract: 5500029737 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1031
Taldeen Plastic Solution 2019 PO / Contract: 5500029736 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1032
Taldeen Plastic Solution 2019 PO / Contract: 5500029679 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1033
Taldeen Plastic Solution 2019 PO / Contract: 5500029632 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1034
Taldeen Plastic Solution 2019 PO / Contract: 5500029574 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

1035
Taldeen Plastic Solution 2019 PO / Contract: 5500029573 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

1036
Taldeen Plastic Solution 2019 PO / Contract: 5500029561 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1037
Taldeen Plastic Solution 2019 PO / Contract: 5500029559 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1038
Taldeen Plastic Solution 2019 PO / Contract: 5500029503 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

1039
Taldeen Plastic Solution 2019 PO / Contract: 5500029500 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

1040
Taldeen Plastic Solution 2019 PO / Contract: 5500029408 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1041
Taldeen Plastic Solution 2019 PO / Contract: 5500029285 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1042
Taldeen Plastic Solution 2019 PO / Contract: 5500029284 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1043
Taldeen Plastic Solution 2019 PO / Contract: 5500029248 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

1044
Taldeen Plastic Solution 2019 PO / Contract: 5500029244 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1045
Taldeen Plastic Solution 2019 PO / Contract: 5500029177 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1046
Taldeen Plastic Solution 2019 PO / Contract: 5500029011 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1047
Taldeen Plastic Solution 2019 PO / Contract: 5500028973 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1048
Taldeen Plastic Solution 2019 PO / Contract: 5500028968 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1049
Taldeen Plastic Solution 2019 PO / Contract: 5500028957 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1050
Taldeen Plastic Solution 2019 PO / Contract: 5500028911 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1051
Taldeen Plastic Solution 2019 PO / Contract: 5500028908 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1052
Taldeen Plastic Solution 2019 PO / Contract: 5500028896 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

1053
Taldeen Plastic Solution 2019 PO / Contract: 5500028772 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1054
Taldeen Plastic Solution 2019 PO / Contract: 5500028725 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1055
Taldeen Plastic Solution 2019 PO / Contract: 5500028696 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1056
Taldeen Plastic Solution 2019 PO / Contract: 5500028686 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1057
Taldeen Plastic Solution 2019 PO / Contract: 5500028656 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1058
Taldeen Plastic Solution 2019 PO / Contract: 5500028654 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1059
Taldeen Plastic Solution 2019 PO / Contract: 5500028547 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

1060
Taldeen Plastic Solution 2019 PO / Contract: 5500028468 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1061
Taldeen Plastic Solution 2019 PO / Contract: 5500028387 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1062
Taldeen Plastic Solution 2019 PO / Contract: 5500028372 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1063
Taldeen Plastic Solution 2019 PO / Contract: 5500028371 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

1064
Taldeen Plastic Solution 2019 PO / Contract: 5500028359 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1065
Taldeen Plastic Solution 2019 PO / Contract: 5500028282 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

1066
Taldeen Plastic Solution 2019 PO / Contract: 5500028181 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

1067
Taldeen Plastic Solution 2019 PO / Contract: 5500028110 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

1068
Taldeen Plastic Solution 2019 PO / Contract: 5500028108 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

1069
Taldeen Plastic Solution 2019 PO / Contract: 5500028107 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

1070
Taldeen Plastic Solution 2019 PO / Contract: 5500028093 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

1071
Taldeen Plastic Solution 2019 PO / Contract: 5500028085 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

1072
Taldeen Plastic Solution 2019 PO / Contract: 5500028069 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1073
Taldeen Plastic Solution 2019 PO / Contract: 5500028056 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1074
Taldeen Plastic Solution 2019 PO / Contract: 5500028052 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1075
Taldeen Plastic Solution 2019 PO / Contract: 5500028028 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1076
Taldeen Plastic Solution 2019 PO / Contract: 5500027889 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1077
Taldeen Plastic Solution 2019 PO / Contract: 5500027888 Completed

Under Three-Year Long-Term ARC Contract at SAAC

1078
Taldeen Plastic Solution 2019 PO / Contract: 5500027887 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1079
Taldeen Plastic Solution 2019 PO / Contract: 5500027886 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

1080
Taldeen Plastic Solution 2019 PO / Contract: 5500027877 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1081
Taldeen Plastic Solution 2019 PO / Contract: 5500027839 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1082
Taldeen Plastic Solution 2019 PO / Contract: 5500027834 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1083
Taldeen Plastic Solution 2019 PO / Contract: 5500027813 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

266
SAHARA 2018 PO / Contract: 4500027126 Completed

PMC Services

267
TASNEE 2018 PO / Contract: 5500024260 Completed

Turnaround Manpower services in LDPE Plant

268
Saudi Butanol Company 2018 PO / Contract: 5500058981 Completed

Piping system hydrotesting, flushing, and pre-commissioning.

269
Saudi Polyolefin Company 2018 PO / Contract: 5500059610 Completed

Skid fabrication and mechanical package assembly.

270
Saudi Butanol Company 2018 PO / Contract: 5500059628 Completed

RCC trench and precast cover installation for construction and repair of RCC trenches with precast covers.

271
SAPCO (Saudi Acrylic Polymer Company) 2018 PO / Contract: 5500059678 Completed

Grouting works for machine foundations and anchor bolts to enhance stability.

272
Saudi Acrylic Acid Company 2018 PO / Contract: 5500059952 Completed

Installation of field instruments (pressure, temperature, level, flow), ensuring proper calibration, adjustments, and replacements during routine maintenance or plant shutdowns.

273
Saudi Polyolefin Company 2018 PO / Contract: 5500060367 Completed

Installation of analyzer shelters and utilities, ensuring safe and effective operation of analytical instruments during shutdowns or routine maintenance.

274
TASNEE 2018 PO / Contract: 4500099211 Completed

Replacement and re-calibration of faulty or outdated instruments, meeting operational standards during plant turnarounds.

275
Saudi Butanol Company 2018 PO / Contract: 5500060488 Completed

Fire alarm system inspection and maintenance, ensuring all components are functioning correctly during routine maintenance or shutdowns.

276
Saudi Acrylic Monomer Company 2018 PO / Contract: 5500061452 Completed

BMS energy management optimization, monitoring energy usage to improve efficiency and reduce costs during routine operations and shutdowns.

277
Saudi Polyolefin Company 2018 PO / Contract: 5500061472 Completed

Fire suppression system recharging and refilling, ensuring readiness for future use by recharging systems after servicing or emergency use.

278
SAPCO (Saudi Acrylic Polymer Company) 2018 PO / Contract: 5500062224 Completed

Flange connection torqueing and sealing, achieving leak-free connections and maintaining system integrity.

279
SEPC (Saudi Ethylene and Polyethylene Company) 2018 PO / Contract: 5500062256 Completed

Busbar system inspection and tightening, maintaining conductivity and reducing the risk of electrical faults.

280
Technical Tetravalent Lead Smelting Plant 2018 PO / Contract: 5500062525 Completed

Landscaping and green area maintenance, enhancing environmental aesthetics and compliance with site upkeep standards.

281
Taldeen Plastic Solution 2018 PO / Contract: 5500063379 Completed

Plumbing and drainage system maintenance, ensuring uninterrupted flow and preventing blockages in facility pipelines.

282
National Lead Smelting Company 2018 PO / Contract: 5500063557 Completed

BMS controller health check and diagnostics, ensuring stable and responsive building management operations.

283
National Lead Smelting Company 2018 PO / Contract: 5500064149 Completed

UPS system maintenance and battery health checks, ensuring uninterrupted power for critical systems.

284
RIG (Rowad International Geosynthetics Company) 2018 PO / Contract: 5500065027 Completed

Inspection and repair of outdoor lighting poles and cabling, ensuring safety and visibility in external areas.

285
RIG (Rowad International Geosynthetics Company) 2018 PO / Contract: 5500065880 Completed

CCTV system recording verification and storage backup checks, ensuring security data integrity.

286
Technical Tetravalent Lead Smelting Plant 2018 PO / Contract: 5500066149 Completed

CCTV and access control system installation and integration, enhancing security and monitoring capabilities.

287
Rassas 2018 PO / Contract: 5500067693 Completed

Outside Plant (OSP) works including trenching, ducting, and cable laying, for underground and inter-building connectivity.

288
National Lead Smelting Company 2018 PO / Contract: 5500068225 Completed

Setup and maintenance of advanced CCTV surveillance systems, enhancing facility security with high-definition video capture and remote monitoring.

289
Technical Tetravalent Lead Smelting Plant 2018 PO / Contract: 5500068665 Completed

Setup and maintenance of scalable IP video surveillance solutions, allowing for remote access and real-time incident tracking.

290
Rowad Global Packaging Company 2018 PO / Contract: 5500069318 Completed

IP telephony and network switch setup, providing seamless voice and data communication with secure and scalable networking solutions.

291
Rassas 2018 PO / Contract: 5500069351 Completed

Configuration of fiber optic backbone infrastructure, ensuring fast and reliable connections between data centers and remote facilities.

292
Rassas 2018 PO / Contract: 5500017574 Completed

Laser alignment of pumps, motors, compressors and rotating equipment.

293
Rassas 2018 PO / Contract: 5500017717 Completed

Fire-and-gas detection system design for process and storage areas.

294
Rassas 2018 PO / Contract: 5500018122 Completed

Replacement of damaged expansion joints and flexible piping connections.

295
Rassas 2018 PO / Contract: 5500018244 Completed

Scaffolding inspection and safety certification during shutdowns.

296
Rassas 2018 PO / Contract: 5500018895 Completed

Replacement of cooling-tower fills, drift eliminators, louvers and nozzles.

297
Rassas 2018 PO / Contract: 5500019076 Completed

Cable glanding, termination and testing for electrical equipment.

298
Rassas 2018 PO / Contract: 5500019219 Completed

Fabrication and installation of trunnions, dummy legs, pipe shoes, guides, anchors and line stops.

299
Rassas 2018 PO / Contract: 5500019405 Completed

Retubing and mechanical repair of shell-and-tube heat exchangers.

300
Rassas 2018 PO / Contract: 5500019630 Completed

Hydraulic assessment and line sizing for plant utility-water networks.

301
Rassas 2018 PO / Contract: 5500019953 Completed

Calibration and testing of gas detectors, flame detectors and alarm devices.

302
Rassas 2018 PO / Contract: 5500020304 Completed

Replacement of deteriorated underground GRP, RTR and HDPE pipelines.

303
Rassas 2018 PO / Contract: 5500020704 Completed

Repair of pipe-support steel structures, baseplates, anchor bolts and concrete pedestals.

304
Rassas 2018 PO / Contract: 5500020888 Completed

Preventive maintenance of turbines, compressors and rotating machinery.

305
Rassas 2018 PO / Contract: 5500021025 Completed

Rehabilitation of cracked reinforced-concrete equipment foundations.

306
Rassas 2018 PO / Contract: 5500021285 Completed

DCS hardware replacement and control-system software updates.

307
Rassas 2018 PO / Contract: 5500021676 Completed

Direct-current voltage-gradient surveys for identifying buried pipeline coating defects.

308
Rassas 2018 PO / Contract: 5500021929 Completed

Replacement of isolation valves, check valves and safety relief valves.

309
Rassas 2018 PO / Contract: 5500022168 Completed

Mechanical-completion inspection and preparation of punch lists.

310
Rassas 2018 PO / Contract: 5500022506 Completed

Detailed piping design for installing new process equipment at TASNEE facilities.

311
Rassas 2018 PO / Contract: 5500022647 Completed

Cleaning and maintenance of cooling-tower basins and water systems.

312
Rassas 2018 PO / Contract: 5500022924 Completed

Installation of medium-voltage and low-voltage power cables.

313
Rassas 2018 PO / Contract: 5500023117 Completed

Replacement of vessel internals, trays, demisters and distributors.

314
Rassas 2018 PO / Contract: 5500023312 Completed

Correction of piping misalignment and excessive movement caused by failed or displaced supports.

315
Rassas 2018 PO / Contract: 5500023601 Completed

Welding inspection and quality control for piping fabrication works.

316
Rassas 2018 PO / Contract: 5500023867 Completed

Application of chemical-resistant coatings to concrete surfaces.

317
Rassas 2018 PO / Contract: 5500024025 Completed

Maintenance and troubleshooting of automatic tank-gauging systems.

318
Rassas 2018 PO / Contract: 5500024116 Completed

Fabrication and installation of carbon-steel process piping.

319
Rassas 2018 PO / Contract: 5500024436 Completed

Arc-flash assessment and preparation of electrical equipment hazard labels.

320
Rassas 2018 PO / Contract: 5500024443 Completed

Rehabilitation of existing cathodic-protection systems, including anode beds, test stations, cables and reference electrodes.

321
Rassas 2018 PO / Contract: 5500024763 Completed

Overhaul and alignment of centrifugal pumps and electric motors.

322
Rassas 2018 PO / Contract: 5500024862 Completed

Design of pipe racks, access platforms, ladders and equipment-support structures.

323
Rassas 2018 PO / Contract: 5500025093 Completed

Phased-array ultrasonic testing of critical welded joints.

324
Rassas 2018 PO / Contract: 5500025258 Completed

Cooling-tower basin concrete repair and waterproofing.

325
Rassas 2018 PO / Contract: 5500025291 Completed

Installation and termination of instrument and control cables.

326
Rassas 2018 PO / Contract: 5500025803 Completed

Modification and strengthening of piping supports for rerouted lines and increased operating loads.

327
Rassas 2018 PO / Contract: 5500025915 Completed

Replacement of corroded process piping during scheduled shutdowns.

328
Rassas 2018 PO / Contract: 5500026172 Completed

Circuit-breaker inspection, testing and mechanical servicing.

329
Rassas 2018 PO / Contract: 5500026327 Completed

Replacement of exchanger channel covers, gaskets and fasteners.

330
Rassas 2018 PO / Contract: 5500026471 Completed

Civil and structural design of foundations for pumps, vessels and compressors.

331
Rassas 2018 PO / Contract: 5500026770 Completed

Testing of process alarms, interlocks and emergency shutdown functions.

332
Rassas 2018 PO / Contract: 5500026827 Completed

Testing and rectification of insulating joints, isolation flanges, pipeline bonds and stray-current interference.

333
Rassas 2018 PO / Contract: 5500027036 Completed

Surface preparation and protective coating of industrial steel structures.

334
Rassas 2018 PO / Contract: 5500027112 Completed

Replacement of damaged instrument tubing, manifolds and fittings.

335
Rassas 2018 PO / Contract: 5500027215 Completed

Pressure testing and certification of repaired industrial valves.

336
Rassas 2018 PO / Contract: 5500027366 Completed

Installation of permanent pipe supports, guides, anchors and spring hangers.

337
Rassas 2018 PO / Contract: 5500027679 Completed

Material receiving inspection and traceability control at project sites.

338
Rassas 2018 PO / Contract: 5500027761 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

339
Rassas 2018 PO / Contract: 5500027692 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

340
Rassas 2018 PO / Contract: 5500027689 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

341
Rassas 2018 PO / Contract: 5500027680 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

342
Rassas 2018 PO / Contract: 5500027477 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

343
Rassas 2018 PO / Contract: 5500027446 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

344
Rassas 2018 PO / Contract: 5500027425 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

345
Rassas 2018 PO / Contract: 5500027421 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

346
Rassas 2018 PO / Contract: 5500027419 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

347
Rassas 2018 PO / Contract: 5500027386 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

348
Rassas 2018 PO / Contract: 5500027385 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

349
Rassas 2018 PO / Contract: 5500027350 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

350
Rassas 2018 PO / Contract: 5500027336 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

351
Rassas 2018 PO / Contract: 5500027320 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

352
Rassas 2018 PO / Contract: 5500027305 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

353
Rassas 2018 PO / Contract: 4500082808 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

354
Rassas 2018 PO / Contract: 5500027237 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

355
Rassas 2018 PO / Contract: 5500027221 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

356
Rassas 2018 PO / Contract: 5500027169 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

357
Rassas 2018 PO / Contract: 5500027154 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

358
Rassas 2018 PO / Contract: 5500027135 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

359
Rassas 2018 PO / Contract: 5500027134 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

360
Rassas 2018 PO / Contract: 5500027127 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

361
Rassas 2018 PO / Contract: 5500027125 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

362
Rassas 2018 PO / Contract: 5500027113 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

363
Rassas 2018 PO / Contract: 5500027111 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

364
Rassas 2018 PO / Contract: 5500027070 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

365
Rassas 2018 PO / Contract: 5500027069 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

366
Rassas 2018 PO / Contract: 5500027068 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

367
Rassas 2018 PO / Contract: 5500027043 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

368
Rassas 2018 PO / Contract: 5500027040 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

369
Rassas 2018 PO / Contract: 5500027035 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

370
Rassas 2018 PO / Contract: 5500027034 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

371
Rassas 2018 PO / Contract: 5500026992 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

372
Rassas 2018 PO / Contract: 5500026991 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

373
Rassas 2018 PO / Contract: 5500026980 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

374
Rassas 2018 PO / Contract: 5500026926 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

375
Rassas 2018 PO / Contract: 5500026895 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

376
Rassas 2018 PO / Contract: 5500026812 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

377
Rassas 2018 PO / Contract: 5500026810 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

378
Rassas 2018 PO / Contract: 5500026807 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

379
Rassas 2018 PO / Contract: 5500026805 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

380
Rassas 2018 PO / Contract: 5500026803 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

381
Rassas 2018 PO / Contract: 5500026802 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

382
Rassas 2018 PO / Contract: 5500026796 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

383
Rassas 2018 PO / Contract: 5500026734 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

384
Rassas 2018 PO / Contract: 5500026714 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

385
Rassas 2018 PO / Contract: 5500026708 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

386
Rassas 2018 PO / Contract: 5500026687 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

387
Rassas 2018 PO / Contract: 5500026686 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

388
Rassas 2018 PO / Contract: 5500026584 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

389
Rassas 2018 PO / Contract: 5500026485 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

390
Rassas 2018 PO / Contract: 5500026456 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

391
Rassas 2018 PO / Contract: 5500026449 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

392
Rassas 2018 PO / Contract: 5500026405 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

393
Rassas 2018 PO / Contract: 5500026387 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

394
Rassas 2018 PO / Contract: 5500026368 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

395
Rassas 2018 PO / Contract: 5500026367 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

396
Rassas 2018 PO / Contract: 5500026366 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

397
Rassas 2018 PO / Contract: 5500026320 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

398
Rassas 2018 PO / Contract: 5500026268 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

399
Rassas 2018 PO / Contract: 5500026223 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

400
Rassas 2018 PO / Contract: 5500026219 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

401
Rassas 2018 PO / Contract: 5500026212 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

402
Rassas 2018 PO / Contract: 5500026189 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

403
Rassas 2018 PO / Contract: 5500026188 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

404
Rassas 2018 PO / Contract: 5500026143 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

405
Rassas 2018 PO / Contract: 5500026133 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

406
Rassas 2018 PO / Contract: 5500026132 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

407
Rassas 2018 PO / Contract: 5500026131 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

408
Rassas 2018 PO / Contract: 5500026130 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

409
Rassas 2018 PO / Contract: 5500025945 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

410
Rassas 2018 PO / Contract: 5500025933 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

411
Rassas 2018 PO / Contract: 5500025914 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

412
Rassas 2018 PO / Contract: 5500025897 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

413
Rassas 2018 PO / Contract: 5500025869 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

414
Rassas 2018 PO / Contract: 5500025868 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

415
Rassas 2018 PO / Contract: 5500025841 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

416
Rassas 2018 PO / Contract: 5500025835 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

417
Rassas 2018 PO / Contract: 5500025693 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

418
Rassas 2018 PO / Contract: 5500025658 Completed

Under Three-Year Long-Term ARC Contract at SAAC

419
Rassas 2018 PO / Contract: 5500025634 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

420
Rassas 2018 PO / Contract: 5500025540 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

421
Rassas 2018 PO / Contract: 5500025445 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

422
Rassas 2018 PO / Contract: 5500025355 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

423
Rassas 2018 PO / Contract: 5500025317 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

424
Rassas 2018 PO / Contract: 5500025273 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

425
Rassas 2018 PO / Contract: 5500025272 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

426
Rassas 2018 PO / Contract: 5500025271 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

427
Rassas 2018 PO / Contract: 5500025270 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

428
Rassas 2018 PO / Contract: 5500025269 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

429
Rassas 2018 PO / Contract: 5500025268 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

430
Rassas 2018 PO / Contract: 5500025264 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

431
Rassas 2018 PO / Contract: 5500025239 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

432
Rassas 2018 PO / Contract: 5500025228 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

433
Rassas 2018 PO / Contract: 5500025207 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

434
Rassas 2018 PO / Contract: 5500025206 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

435
Rassas 2018 PO / Contract: 5500025165 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

436
Rassas 2018 PO / Contract: 5500025147 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

437
Rassas 2018 PO / Contract: 5500025123 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

438
Rassas 2018 PO / Contract: 5500025050 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

439
Rassas 2018 PO / Contract: 5500025049 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

440
Rassas 2018 PO / Contract: 5500025048 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

441
Rassas 2018 PO / Contract: 5500025046 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

442
Rassas 2018 PO / Contract: 5500024982 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

443
Rassas 2018 PO / Contract: 5500024979 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

444
Rassas 2018 PO / Contract: 5500024947 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

445
Rassas 2018 PO / Contract: 5500024821 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

446
Rassas 2018 PO / Contract: 5500024820 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

447
Rassas 2018 PO / Contract: 5500024798 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

448
Rassas 2018 PO / Contract: 5500024797 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

449
Rassas 2018 PO / Contract: 5500024796 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

450
Rassas 2018 PO / Contract: 5500024766 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

451
Rassas 2018 PO / Contract: 5500024764 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

452
Rassas 2018 PO / Contract: 5500024719 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

453
Rassas 2018 PO / Contract: 5500024663 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

454
Rassas 2018 PO / Contract: 5500024662 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

455
Rassas 2018 PO / Contract: 5500024556 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

456
Rassas 2018 PO / Contract: 5500024547 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

457
Rassas 2018 PO / Contract: 5500024476 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

458
Rassas 2018 PO / Contract: 5500024473 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

459
Rassas 2018 PO / Contract: 5500024442 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

460
Rassas 2018 PO / Contract: 5500024441 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

461
Rassas 2018 PO / Contract: 5500024440 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

462
Rassas 2018 PO / Contract: 5500024439 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

463
Rassas 2018 PO / Contract: 5500024438 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

464
Rassas 2018 PO / Contract: 5500024437 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

465
Rassas 2018 PO / Contract: 5500024422 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

466
Rassas 2018 PO / Contract: 5500024360 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

467
Rassas 2018 PO / Contract: 5500024354 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

468
Rassas 2018 PO / Contract: 5500024306 Completed

Under Three-Year Long-Term ARC Contract at SAAC

469
Rassas 2018 PO / Contract: 5500024222 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

470
Rassas 2018 PO / Contract: 5500024209 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

471
Rassas 2018 PO / Contract: 5500024206 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

472
Rassas 2018 PO / Contract: 5500024111 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

473
Rassas 2018 PO / Contract: 5500024093 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

474
Rassas 2018 PO / Contract: 5500024092 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

475
Rassas 2018 PO / Contract: 5500024089 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

476
Rassas 2018 PO / Contract: 5500024048 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

477
Rassas 2018 PO / Contract: 5500024047 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

478
Rassas 2018 PO / Contract: 5500024037 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

479
Rassas 2018 PO / Contract: 5500024016 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

480
Rassas 2018 PO / Contract: 5500024015 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

481
Rassas 2018 PO / Contract: 5500023957 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

482
Rassas 2018 PO / Contract: 5500023955 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

483
Rassas 2018 PO / Contract: 5500023903 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

484
Rassas 2018 PO / Contract: 5500023885 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

485
Rassas 2018 PO / Contract: 5500023884 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

486
Rassas 2018 PO / Contract: 5500023866 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

487
Rassas 2018 PO / Contract: 5500023772 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

488
Rassas 2018 PO / Contract: 5500023759 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

489
Rassas 2018 PO / Contract: 5500023661 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

490
Rassas 2018 PO / Contract: 5500023651 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

491
Rassas 2018 PO / Contract: 5500023638 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

492
Rassas 2018 PO / Contract: 5500023616 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

493
Rassas 2018 PO / Contract: 5500023600 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

494
Rassas 2018 PO / Contract: 5500023593 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

495
Rassas 2018 PO / Contract: 5500023543 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

496
Rassas 2018 PO / Contract: 5500023464 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

497
Rassas 2018 PO / Contract: 5500023434 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

498
Rassas 2018 PO / Contract: 5500023327 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

499
Rassas 2018 PO / Contract: 5500023322 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

500
Rassas 2018 PO / Contract: 5500023296 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

501
Rassas 2018 PO / Contract: 5500023295 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

502
Rassas 2018 PO / Contract: 5500023292 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

503
Rassas 2018 PO / Contract: 5500023235 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

504
Rassas 2018 PO / Contract: 5500023234 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

505
Rassas 2018 PO / Contract: 5500023200 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

506
Rassas 2018 PO / Contract: 5500023115 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

507
Rassas 2018 PO / Contract: 5500023114 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

508
Rassas 2018 PO / Contract: 5500023103 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

509
Rassas 2018 PO / Contract: 5500023076 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

510
Rassas 2018 PO / Contract: 5500023073 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

511
Rassas 2018 PO / Contract: 5500023022 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

512
Rassas 2018 PO / Contract: 4500076720 Completed

Under Three-Year Long-Term ARC Contract at NPIC Plant

513
Rassas 2018 PO / Contract: 5500022721 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

514
Rassas 2018 PO / Contract: 5500022701 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

515
Rassas 2018 PO / Contract: 5500022653 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

516
Rassas 2018 PO / Contract: 5500022652 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

517
Rassas 2018 PO / Contract: 5500022651 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

518
Rassas 2018 PO / Contract: 5500022650 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

519
Rassas 2018 PO / Contract: 5500022649 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

520
Rassas 2018 PO / Contract: 5500022646 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

521
Rassas 2018 PO / Contract: 5500022645 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

522
Rassas 2018 PO / Contract: 5500022644 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

523
Rassas 2018 PO / Contract: 5500022624 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

524
Rassas 2018 PO / Contract: 5500022623 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

525
Rassas 2018 PO / Contract: 5500022613 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

526
Rassas 2018 PO / Contract: 5500022565 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

527
Rassas 2018 PO / Contract: 5500022432 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

528
Rassas 2018 PO / Contract: 5500022431 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

529
Rassas 2018 PO / Contract: 5500022428 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

530
Rassas 2018 PO / Contract: 5500022353 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

531
Rassas 2018 PO / Contract: 5500022312 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

532
Rassas 2018 PO / Contract: 5500022295 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

533
Rassas 2018 PO / Contract: 5500022270 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

534
Rassas 2018 PO / Contract: 5500022107 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

535
Rassas 2018 PO / Contract: 5500022074 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

536
Rassas 2018 PO / Contract: 5500022049 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

537
Rassas 2018 PO / Contract: 5500021933 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

538
Rassas 2018 PO / Contract: 5500021932 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

539
Rassas 2018 PO / Contract: 5500021931 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

540
Rassas 2018 PO / Contract: 5500021930 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

541
Rassas 2018 PO / Contract: 5500021927 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

542
Rassas 2018 PO / Contract: 5500021853 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

543
Rassas 2018 PO / Contract: 5500021832 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

544
Rassas 2018 PO / Contract: 5500021787 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

545
Rassas 2018 PO / Contract: 5500021786 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

546
Rassas 2018 PO / Contract: 5500021756 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

547
Rassas 2018 PO / Contract: 5500021750 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

548
Rassas 2018 PO / Contract: 5500021675 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

549
Rassas 2018 PO / Contract: 5500021646 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

550
Rassas 2018 PO / Contract: 5500021636 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

551
Rassas 2018 PO / Contract: 5500021623 Completed

Under Three-Year Long-Term ARC Contract at SAAC

552
Rassas 2018 PO / Contract: 5500021550 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

553
Rassas 2018 PO / Contract: 5500021367 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

554
Rassas 2018 PO / Contract: 5500021224 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

555
Rassas 2018 PO / Contract: 5500021196 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

556
Rassas 2018 PO / Contract: 5500021178 Completed

Under Three-Year Long-Term ARC Contract at SAAC

557
Rassas 2018 PO / Contract: 5500021174 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

558
Rassas 2018 PO / Contract: 5500021070 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

559
Rassas 2018 PO / Contract: 5500021043 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

560
Rassas 2018 PO / Contract: 5500021027 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

561
Rassas 2018 PO / Contract: 5500020999 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

562
Rassas 2018 PO / Contract: 5500020970 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

563
Rassas 2018 PO / Contract: 5500020928 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

564
Rassas 2018 PO / Contract: 5500020927 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

565
Rassas 2018 PO / Contract: 5500020926 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

566
Rassas 2018 PO / Contract: 5500020892 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

567
Rassas 2018 PO / Contract: 5500020889 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

568
Rassas 2018 PO / Contract: 5500020793 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

569
Rassas 2018 PO / Contract: 5500020792 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

570
Rassas 2018 PO / Contract: 5500020789 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

571
Rassas 2018 PO / Contract: 5500020788 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

572
Rassas 2018 PO / Contract: 5500020787 Completed

Under Three-Year Long-Term ARC Contract at SAAC

573
Rassas 2018 PO / Contract: 5500020765 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

574
Rassas 2018 PO / Contract: 4500073620 Completed

Under Three-Year Long-Term ARC Contract at NPIC Plant

575
Rassas 2018 PO / Contract: 5500020702 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

576
Rassas 2018 PO / Contract: 5500020611 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

577
Rassas 2018 PO / Contract: 5500020543 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

578
Rassas 2018 PO / Contract: 5500020506 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

579
Rassas 2018 PO / Contract: 5500020435 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

580
Rassas 2018 PO / Contract: 5500020381 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

581
Rassas 2018 PO / Contract: 5500020366 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

582
Rassas 2018 PO / Contract: 5500020300 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

583
Rassas 2018 PO / Contract: 5500020299 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

584
Rassas 2018 PO / Contract: 5500020252 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

585
Rassas 2018 PO / Contract: 5500020221 Completed

Under Three-Year Long-Term ARC Contract at SAAC

586
Rassas 2018 PO / Contract: 5500020199 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

587
Rassas 2018 PO / Contract: 5500020191 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

588
Rassas 2018 PO / Contract: 5500020012 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

589
Rassas 2018 PO / Contract: 5500019884 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

590
Rassas 2018 PO / Contract: 5500019873 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

591
Rassas 2018 PO / Contract: 5500019868 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

592
Rassas 2018 PO / Contract: 5500019749 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

593
Rassas 2018 PO / Contract: 5500019715 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

594
Rassas 2018 PO / Contract: 4500071850 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

595
Rassas 2018 PO / Contract: 5500019613 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

596
Rassas 2018 PO / Contract: 5500019568 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

597
Rassas 2018 PO / Contract: 5500019481 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

598
Rassas 2018 PO / Contract: 4500071622 Completed

Under Three-Year Long-Term ARC Contract at NPIC Plant

599
Rassas 2018 PO / Contract: 5500019455 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

600
Rassas 2018 PO / Contract: 5500019438 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

601
Rassas 2018 PO / Contract: 5500019433 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

602
Rassas 2018 PO / Contract: 5500019393 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

603
Rassas 2018 PO / Contract: 5500019392 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

604
Rassas 2018 PO / Contract: 5500019391 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

605
Rassas 2018 PO / Contract: 5500019390 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

606
Rassas 2018 PO / Contract: 5500019366 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

607
Rassas 2018 PO / Contract: 5500019324 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

608
Rassas 2018 PO / Contract: 5500019259 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

609
Rassas 2018 PO / Contract: 5500019213 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

610
Rassas 2018 PO / Contract: 5500019183 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

611
Rassas 2018 PO / Contract: 5500019182 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

612
Rassas 2018 PO / Contract: 5500019181 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

613
Rassas 2018 PO / Contract: 5500019180 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

614
Rassas 2018 PO / Contract: 5500019177 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

615
Rassas 2018 PO / Contract: 5500019078 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

616
Rassas 2018 PO / Contract: 5500019054 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

617
Rassas 2018 PO / Contract: 5500019039 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

618
Rassas 2018 PO / Contract: 5500019026 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

619
Rassas 2018 PO / Contract: 5500018982 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

620
Rassas 2018 PO / Contract: 5500018980 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

621
Rassas 2018 PO / Contract: 5500018911 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

622
Rassas 2018 PO / Contract: 5500018896 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

623
Rassas 2018 PO / Contract: 5500018885 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

624
Rassas 2018 PO / Contract: 5500018883 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

625
Rassas 2018 PO / Contract: 5500018880 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

626
Rassas 2018 PO / Contract: 5500018565 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

627
Rassas 2018 PO / Contract: 5500018458 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

628
Rassas 2018 PO / Contract: 5500018410 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

629
Rassas 2018 PO / Contract: 5500018312 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

630
Rassas 2018 PO / Contract: 5500018242 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

631
Rassas 2018 PO / Contract: 5500018220 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

632
Rassas 2018 PO / Contract: 5500018219 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

633
Rassas 2018 PO / Contract: 5500018188 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

634
Rassas 2018 PO / Contract: 5500018187 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

635
Rassas 2018 PO / Contract: 5500018131 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

636
Rassas 2018 PO / Contract: 5500018124 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

637
Rassas 2018 PO / Contract: 5500018029 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

638
Rassas 2018 PO / Contract: 5500018007 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

639
Rassas 2018 PO / Contract: 5500017997 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

640
Rassas 2018 PO / Contract: 5500017803 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

641
Rassas 2018 PO / Contract: 5500017798 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

642
Rassas 2018 PO / Contract: 5500017741 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

643
Rassas 2018 PO / Contract: 5500017714 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

644
Rassas 2018 PO / Contract: 5500017701 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

645
Rassas 2018 PO / Contract: 5500017692 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

646
Rassas 2018 PO / Contract: 5500017646 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

647
Rassas 2018 PO / Contract: 5500017613 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

648
Rassas 2018 PO / Contract: 5500017587 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

649
Rassas 2018 PO / Contract: 5500017585 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

650
Rassas 2018 PO / Contract: 5500017565 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

651
Rassas 2018 PO / Contract: 5500017562 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

652
Rassas 2018 PO / Contract: 5500017557 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

653
Rassas 2018 PO / Contract: 5500017509 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

654
Rassas 2018 PO / Contract: 5500017488 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

655
Rassas 2018 PO / Contract: 5500017478 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

041
TASNEE 2017 PO / Contract: 4500071622 Completed

PMC Services

042
TASNEE 2017 PO / Contract: 4500073620 Completed

PMC Services

043
NBC (National Batteries Company) 2017 PO / Contract: 5500058067 Completed

Creation and maintenance of secure wireless networks, facilitating seamless communication and data exchange across large-scale industrial sites.

044
RIG (Rowad International Geosynthetics Company) 2017 PO / Contract: 5500058661 Completed

Structured cabling system design and installation, ensuring efficient connectivity and network infrastructure for reliable communication.

045
ISCOSA 2017 PO / Contract: 5500058663 Completed

Site Support service for the Turbine overhauling project at TASNEE’s Jubail plant to restore turbine performance and ensure operational reliability.

SIEMENS

046
Rassas 2017 PO / Contract: 5500058724 Completed

Integration of telecom and IT infrastructure with building management systems to enable seamless monitoring and control of facilities.

047
TASNEE 2017 PO / Contract: 5500019715 Completed

Turnaround Manpower services in AA Chemical Plant

048
TASNEE 2017 PO / Contract: 5500020304 Completed

Global Shutdown Manpower Services- HDPE, LDPE,UTOS, CRACKER Plants

049
Saudi Polyolefin Company 2017 PO / Contract: 5500041796 Completed

Stainless steel piping works for process and utility systems.

050
SAPCO (Saudi Acrylic Polymer Company) 2017 PO / Contract: 5500041801 Completed

Concrete foundation repairs involving restoration of concrete foundations, including equipment pads, pipe racks, and transformers.

051
Saudi Butanol Company 2017 PO / Contract: 5500042328 Completed

Fence and boundary wall repairs through repair and restoration of perimeter fences and boundary walls.

052
TASNEE 2017 PO / Contract: 4500099200 Completed

Performing loop checking and commissioning support, verifying system integrity and functionality during shutdown and turnarounds.

053
TASNEE 2017 PO / Contract: 5500020765 Completed

Shutdown Manpower Services in SAP Plant TASNEE

054
TASNEE 2017 PO / Contract: 5500024360 Completed

Shutdown Manpower Services in PP Plant TASNEE

055
SEPC (Saudi Ethylene and Polyethylene Company) 2017 PO / Contract: 5500042356 Completed

Vibration monitoring system installation, supporting the monitoring of critical equipment during shutdowns and turnarounds to enhance long-term operational health.

056
Saudi Acrylic Acid Company 2017 PO / Contract: 5500043459 Completed

Integration of new instrumentation and control systems, implemented during major maintenance and shutdown activities to improve system efficiency.

057
SAPCO (Saudi Acrylic Polymer Company) 2017 PO / Contract: 5500043460 Completed

Replacement of fire alarm detectors and devices, ensuring compliance with safety standards and operational reliability during maintenance activities.

058
EAST GAS 2017 PO / Contract: EGCL/112/2017 Completed

BMS system diagnostics and troubleshooting, resolving issues within the system to maintain continuous building operations during turnarounds.

059
Saudi Butanol Company 2017 PO / Contract: 5500043723 Completed

Fire suppression system modifications, making adjustments or improvements to enhance system efficiency and compliance during plant turnarounds.

060
Saudi Acrylic Monomer Company 2017 PO / Contract: 5500043731 Completed

RTR pipe support installation using non-metallic and metallic materials, ensuring proper alignment and vibration control.

061
NBC (National Batteries Company) 2017 PO / Contract: 5500044885 Completed

Inspection and testing of emergency lighting systems, ensuring proper operation during power outages.

062
NBC (National Batteries Company) 2017 PO / Contract: 5500045098 Completed

Power factor correction system maintenance, optimizing electrical efficiency and reducing energy costs.

063
NBC (National Batteries Company) 2017 PO / Contract: 5500045115 Completed

Inspection and testing of water leak detection systems, preventing damage to building infrastructure.

064
Taldeen Plastic Solution 2017 PO / Contract: 5500057589 Completed

Installation and maintenance of data centers, servers, and backup systems, supporting high availability and disaster recovery.

065
Rowad Global Packaging Company 2017 PO / Contract: 5500057617 Completed

FTTx deployment including FTTH, FTTB, and FTTP, enabling high-speed fiber connectivity to premises and buildings.

066
Taldeen Plastic Solution 2017 PO / Contract: 5500057705 Completed

Deployment of high-speed fiber optic networks, ensuring seamless connectivity between locations with minimal latency and maximum reliability.

067
EAST GAS 2017 PO / Contract: EGCL/115/2017 Completed

Breaker testing and relay calibration in switchgear panels, ensuring protective devices function accurately.

068
NBC (National Batteries Company) 2017 PO / Contract: 5500043879 Completed

Generator operation and preventive maintenance, ensuring backup power systems remain reliable and functional.

069
NBC (National Batteries Company) 2017 PO / Contract: 5500043943 Completed

Building automation system (BAS) servicing, optimizing control over building utilities and energy efficiency.

070
NBC (National Batteries Company) 2017 PO / Contract: 5500044507 Completed

Janitorial and sanitation services in industrial zones, maintaining hygiene standards and operational cleanliness.

071
NBC (National Batteries Company) 2017 PO / Contract: 5500044755 Completed

Fire detection and suppression system maintenance, ensuring safety compliance and operational readiness.

072
TASNEE 2017 PO / Contract: 5500010921 Completed

Inspection and mechanical repair of pressure vessels during shutdown.

073
TASNEE 2017 PO / Contract: 5500011041 Completed

Close-interval potential surveys for underground pipeline networks.

074
TASNEE 2017 PO / Contract: 5500011441 Completed

Concrete inspection and repair of process-area foundations.

075
TASNEE 2017 PO / Contract: 5500011757 Completed

Installation and calibration of pressure, temperature, flow and level transmitters.

076
TASNEE 2017 PO / Contract: 5500012140 Completed

Replacement of corroded pipe supports and structural attachments.

077
TASNEE 2017 PO / Contract: 5500012326 Completed

Repair and replacement of cooling-tower structural members.

078
TASNEE 2017 PO / Contract: 5500012478 Completed

Radiographic inspection of piping and pressure-vessel welds.

079
TASNEE 2017 PO / Contract: 5500012706 Completed

Hot tapping and tie-in works on operational utility-water pipelines.

080
TASNEE 2017 PO / Contract: 5500012977 Completed

ETAP load-flow, short-circuit and protection-coordination studies.

081
TASNEE 2017 PO / Contract: 4500059414 Completed

Heat-exchanger bundle removal, cleaning, inspection and reinstatement.

082
TASNEE 2017 PO / Contract: 5500013403 Completed

HSE supervision and permit-to-work monitoring during plant maintenance.

083
TASNEE 2017 PO / Contract: 5500013651 Completed

Installation of sacrificial-anode cathodic-protection systems for buried piping and storage tanks.

084
TASNEE 2017 PO / Contract: 5500013776 Completed

Roof waterproofing and insulation repair for industrial buildings.

085
TASNEE 2017 PO / Contract: 5500014371 Completed

Overhaul, calibration and testing of process control valves.

086
TASNEE 2017 PO / Contract: 5500014647 Completed

Preparation of instrument indexes, data sheets, loop diagrams and hook-up drawings.

087
TASNEE 2017 PO / Contract: 5500014915 Completed

Installation and load-setting adjustment of variable spring supports for high-temperature piping.

088
TASNEE 2017 PO / Contract: 5500015019 Completed

Chemical cleaning and flushing of process and utility pipelines.

089
TASNEE 2017 PO / Contract: 5500015329 Completed

Replacement of obsolete MCC feeders, breakers and protection devices.

090
TASNEE 2017 PO / Contract: 5500015809 Completed

Internal cleaning and maintenance of process vessels and separators.

091
TASNEE 2017 PO / Contract: 5500016077 Completed

Piping stress analysis and support design for high-temperature process lines.

092
TASNEE 2017 PO / Contract: 5500016292 Completed

Ultrasonic thickness measurement and corrosion mapping of process equipment.

093
TASNEE 2017 PO / Contract: 5500016363 Completed

Repair of industrial roads, drainage channels and concrete pavements.

094
TASNEE 2017 PO / Contract: 5500016609 Completed

Preventive maintenance and troubleshooting of plant field instruments.

095
TASNEE 2017 PO / Contract: 5500017006 Completed

Installation of impressed-current cathodic-protection systems for underground hydrocarbon pipelines.

096
TASNEE 2017 PO / Contract: 5500017247 Completed

Structural repair of industrial platforms and maintenance walkways.

097
TASNEE 2017 PO / Contract: 5500017408 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

098
TASNEE 2017 PO / Contract: 5500017246 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

099
TASNEE 2017 PO / Contract: 5500017241 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

100
TASNEE 2017 PO / Contract: 5500017234 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

101
TASNEE 2017 PO / Contract: 5500017218 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

102
TASNEE 2017 PO / Contract: 5500017091 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

103
TASNEE 2017 PO / Contract: 5500017090 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

104
TASNEE 2017 PO / Contract: 5500017086 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

105
TASNEE 2017 PO / Contract: 5500017004 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

106
TASNEE 2017 PO / Contract: 5500016959 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

107
TASNEE 2017 PO / Contract: 5500016797 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

108
TASNEE 2017 PO / Contract: 5500016742 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

109
TASNEE 2017 PO / Contract: 5500016727 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

110
TASNEE 2017 PO / Contract: 5500016614 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

111
TASNEE 2017 PO / Contract: 5500016610 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

112
TASNEE 2017 PO / Contract: 5500016576 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

113
TASNEE 2017 PO / Contract: 5500016512 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

114
TASNEE 2017 PO / Contract: 5500016491 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

115
TASNEE 2017 PO / Contract: 5500016474 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

116
TASNEE 2017 PO / Contract: 5500016453 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

117
TASNEE 2017 PO / Contract: 5500016452 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

118
TASNEE 2017 PO / Contract: 5500016443 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

119
TASNEE 2017 PO / Contract: 5500016362 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

120
TASNEE 2017 PO / Contract: 5500016361 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

121
TASNEE 2017 PO / Contract: 5500016360 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

122
TASNEE 2017 PO / Contract: 5500016358 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

123
TASNEE 2017 PO / Contract: 5500016357 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

124
TASNEE 2017 PO / Contract: 5500016353 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

125
TASNEE 2017 PO / Contract: 5500016218 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

126
TASNEE 2017 PO / Contract: 5500016215 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

127
TASNEE 2017 PO / Contract: 5500016178 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

128
TASNEE 2017 PO / Contract: 5500016176 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

129
TASNEE 2017 PO / Contract: 5500016149 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

130
TASNEE 2017 PO / Contract: 5500016145 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

131
TASNEE 2017 PO / Contract: 5500016139 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

132
TASNEE 2017 PO / Contract: 5500016033 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

133
TASNEE 2017 PO / Contract: 5500016032 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

134
TASNEE 2017 PO / Contract: 5500016031 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

135
TASNEE 2017 PO / Contract: 5500016021 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

136
TASNEE 2017 PO / Contract: 5500015888 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

137
TASNEE 2017 PO / Contract: 5500015873 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

138
TASNEE 2017 PO / Contract: 5500015872 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

139
TASNEE 2017 PO / Contract: 5500015717 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

140
TASNEE 2017 PO / Contract: 5500015693 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

141
TASNEE 2017 PO / Contract: 5500015662 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

142
TASNEE 2017 PO / Contract: 5500015625 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

143
TASNEE 2017 PO / Contract: 5500015623 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

144
TASNEE 2017 PO / Contract: 5500015606 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

145
TASNEE 2017 PO / Contract: 5500015519 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

146
TASNEE 2017 PO / Contract: 5500015328 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

147
TASNEE 2017 PO / Contract: 5500015305 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

148
TASNEE 2017 PO / Contract: 5500015294 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

149
TASNEE 2017 PO / Contract: 5500015170 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

150
TASNEE 2017 PO / Contract: 5500015128 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

151
TASNEE 2017 PO / Contract: 5500015059 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

152
TASNEE 2017 PO / Contract: 5500015058 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

153
TASNEE 2017 PO / Contract: 5500015018 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

154
TASNEE 2017 PO / Contract: 5500014972 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

155
TASNEE 2017 PO / Contract: 5500014964 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

156
TASNEE 2017 PO / Contract: 5500014963 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

157
TASNEE 2017 PO / Contract: 5500014962 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

158
TASNEE 2017 PO / Contract: 5500014949 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

159
TASNEE 2017 PO / Contract: 5500014916 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

160
TASNEE 2017 PO / Contract: 5500014914 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

161
TASNEE 2017 PO / Contract: 5500014850 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

162
TASNEE 2017 PO / Contract: 5500014849 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

163
TASNEE 2017 PO / Contract: 5500014802 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

164
TASNEE 2017 PO / Contract: 5500014790 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

165
TASNEE 2017 PO / Contract: 5500014779 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

166
TASNEE 2017 PO / Contract: 5500014740 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

167
TASNEE 2017 PO / Contract: 5500014612 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

168
TASNEE 2017 PO / Contract: 5500014578 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

169
TASNEE 2017 PO / Contract: 5500014500 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

170
TASNEE 2017 PO / Contract: 5500014497 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

171
TASNEE 2017 PO / Contract: 5500014436 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

172
TASNEE 2017 PO / Contract: 5500014398 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

173
TASNEE 2017 PO / Contract: 5500014302 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

174
TASNEE 2017 PO / Contract: 4500061544 Completed

Under Three-Year Long-Term ARC Contract at NPIC Plant

175
TASNEE 2017 PO / Contract: 5500013950 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

176
TASNEE 2017 PO / Contract: 5500013940 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

177
TASNEE 2017 PO / Contract: 5500013867 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

178
TASNEE 2017 PO / Contract: 5500013790 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

179
TASNEE 2017 PO / Contract: 5500013777 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

180
TASNEE 2017 PO / Contract: 5500013775 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

181
TASNEE 2017 PO / Contract: 5500013774 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

182
TASNEE 2017 PO / Contract: 5500013773 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

183
TASNEE 2017 PO / Contract: 5500013722 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

184
TASNEE 2017 PO / Contract: 5500013680 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

185
TASNEE 2017 PO / Contract: 4500060691 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

186
TASNEE 2017 PO / Contract: 5500013652 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

187
TASNEE 2017 PO / Contract: 5500013646 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

188
TASNEE 2017 PO / Contract: 5500013602 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

189
TASNEE 2017 PO / Contract: 5500013547 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

190
TASNEE 2017 PO / Contract: 5500013485 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

191
TASNEE 2017 PO / Contract: 5500013459 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

192
TASNEE 2017 PO / Contract: 5500013444 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

193
TASNEE 2017 PO / Contract: 5500013427 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

194
TASNEE 2017 PO / Contract: 5500013393 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

195
TASNEE 2017 PO / Contract: 5500013286 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

196
TASNEE 2017 PO / Contract: 5500013281 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

197
TASNEE 2017 PO / Contract: 5500013279 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

198
TASNEE 2017 PO / Contract: 5500013275 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

199
TASNEE 2017 PO / Contract: 5500013274 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

200
TASNEE 2017 PO / Contract: 5500013269 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

201
TASNEE 2017 PO / Contract: 5500013097 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

202
TASNEE 2017 PO / Contract: 5500013096 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

203
TASNEE 2017 PO / Contract: 5500013070 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

204
TASNEE 2017 PO / Contract: 4500059025 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

205
TASNEE 2017 PO / Contract: 5500013034 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

206
TASNEE 2017 PO / Contract: 5500013017 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

207
TASNEE 2017 PO / Contract: 5500012984 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

208
TASNEE 2017 PO / Contract: 5500012973 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

209
TASNEE 2017 PO / Contract: 5500012948 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

210
TASNEE 2017 PO / Contract: 5500012874 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

211
TASNEE 2017 PO / Contract: 5500012833 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

212
TASNEE 2017 PO / Contract: 5500012739 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

213
TASNEE 2017 PO / Contract: 5500012724 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

214
TASNEE 2017 PO / Contract: 5500012723 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

215
TASNEE 2017 PO / Contract: 5500012688 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

216
TASNEE 2017 PO / Contract: 5500012658 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

217
TASNEE 2017 PO / Contract: 5500012656 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

218
TASNEE 2017 PO / Contract: 5500012625 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

219
TASNEE 2017 PO / Contract: 5500012595 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

220
TASNEE 2017 PO / Contract: 4800015562 Completed

Under Three-Year Long-Term ARC Contract at SAAC

221
TASNEE 2017 PO / Contract: 5500012473 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

222
TASNEE 2017 PO / Contract: 5500012450 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

223
TASNEE 2017 PO / Contract: 5500012445 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

224
TASNEE 2017 PO / Contract: 5500012444 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

225
TASNEE 2017 PO / Contract: 5500012411 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

226
TASNEE 2017 PO / Contract: 5500012353 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

227
TASNEE 2017 PO / Contract: 5500012339 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

228
TASNEE 2017 PO / Contract: 4500057104 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

229
TASNEE 2017 PO / Contract: 5500012319 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

230
TASNEE 2017 PO / Contract: 5500012314 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

231
TASNEE 2017 PO / Contract: 5500012292 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

232
TASNEE 2017 PO / Contract: 5500012212 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

233
TASNEE 2017 PO / Contract: 5500012182 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

234
TASNEE 2017 PO / Contract: 4500056629 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

235
TASNEE 2017 PO / Contract: 5500012069 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

236
TASNEE 2017 PO / Contract: 5500012050 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

237
TASNEE 2017 PO / Contract: 5500012049 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

238
TASNEE 2017 PO / Contract: 5500012048 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

239
TASNEE 2017 PO / Contract: 5500012007 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

240
TASNEE 2017 PO / Contract: 5500012005 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

241
TASNEE 2017 PO / Contract: 4500055929 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

242
TASNEE 2017 PO / Contract: 5500011561 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

243
TASNEE 2017 PO / Contract: 5500011558 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

244
TASNEE 2017 PO / Contract: 5500011498 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

245
TASNEE 2017 PO / Contract: 5500011466 Completed

Under Three-Year Long-Term ARC Contract at SAPCO

246
TASNEE 2017 PO / Contract: 5500011465 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

247
TASNEE 2017 PO / Contract: 5500011464 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

248
TASNEE 2017 PO / Contract: 5500011461 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

249
TASNEE 2017 PO / Contract: 5500011399 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

250
TASNEE 2017 PO / Contract: 4500054604 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

251
TASNEE 2017 PO / Contract: 4500054534 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

252
TASNEE 2017 PO / Contract: 4500054363 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

253
TASNEE 2017 PO / Contract: 4500054349 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

254
TASNEE 2017 PO / Contract: 5500011070 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

255
TASNEE 2017 PO / Contract: 5500011054 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

256
TASNEE 2017 PO / Contract: 5500011029 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

257
TASNEE 2017 PO / Contract: 5500011028 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

258
TASNEE 2017 PO / Contract: 4500054274 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

259
TASNEE 2017 PO / Contract: 4500054269 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

260
TASNEE 2017 PO / Contract: 5500010945 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

261
TASNEE 2017 PO / Contract: 5500010922 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

262
TASNEE 2017 PO / Contract: 5500010860 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

263
TASNEE 2017 PO / Contract: 5500010859 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

264
TASNEE 2017 PO / Contract: 5500010853 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

265
TASNEE 2017 PO / Contract: 5500010852 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

002
SABIC 2016 PO / Contract: 4300031032 Completed

ENRAF System Repair/Troubleshooting Serv Preventive Maintenance, Calibration, Verification (Custody transfer), Troubleshooting and Site Support Services for all types of ENRAF Automatic Tank Gauging (ATG) Systems installed at SabTank, tank terminal operator by vendor . The scope of supply and services of vendor shall include but not limited to the following 1. ENRAF ATG systems installed for all SABIC and Non-SABIC affiliates.2. Communication between CCR, LCR, Berths for ENRAF ATG systems for all SABIC and Non-SABIC affiliates.3. Interface and communication between ENRAF ATG system, SabTank, tank terminal operator, Yokogawa DCS system, GE FANUC ESD system, PLC system or any 3rd party systems.4. ENRAF ATG Calibration & Verification for Custody transfer usage. 5. Hardware & Software of ENRAF ATG system.6. Spare parts for ENRAF ATG system.7. Emergency services : Emergency call response will be 24 Hrs. X 7 days, long term Contract.

SabTank, tank terminal operator affiliate

003
TASNEE 2016 PO / Contract: CW5489 Completed

Long Term Contract- ARC Contract (3 Years)

004
SABIC 2016 PO / Contract: 4300039038 Completed

Building Risk Assessment On SabTank, tank terminal operator, storage facilities in both Jubail Industrial City (with up to 50 tanks and multiple marine berths) and in Yanbu (with vessel berths and tank storage)

SabTank, tank terminal operator affiliate

005
SABIC 2016 PO / Contract: 4501954890 Completed

Inspection for FRP above Ground Piping, Al Bayrouni, Sabic

Al Bayrouni affiliate

006
SABIC 2016 PO / Contract: 4300012275 Completed

Concrete Inspection and Repairing for Ammonia Plant, Al Bayrouni , Sabic

Al Bayrouni affiliate

007
Saudi Acrylic Monomer Company 2016 PO / Contract: 5500018881 Completed

Underground pipeline repair and reinstatement (GRP, RTR, HDPE).

008
Saudi Butanol Company 2016 PO / Contract: 5500019325 Completed

Execution of hot tapping and tie-in works on live utility water process lines to enable system expansion without shutdown

009
Ma’aden 2016 PO / Contract: AAI€‘PO€‘2016€‘0012 Completed

Complete engineering design of a material warehouse, including civil and structural calculations, detailed construction drawings, and fabrication-ready shop drawings. The scope ensures structural integrity, regulatory compliance, and readiness for execution.

Al Amara International Trading & Contracting Co. Ltd

010
Saudi Acrylic Monomer Company 2016 PO / Contract: 5500023660 Completed

Roof waterproofing and insulation repair for roof waterproofing and insulation systems.

011
Saudi Butanol Company 2016 PO / Contract: 5500024205 Completed

Installation and connection of instrument air tubing, ensuring proper functionality and reliable operation during maintenance activities.

012
Saudi Acrylic Monomer Company 2016 PO / Contract: 5500025208 Completed

Preventative maintenance on field instruments, ensuring optimal performance and longevity during scheduled shutdowns and turnarounds.

013
EAST GAS 2016 PO / Contract: EGCL/024/2016 Completed

Long-term maintenance of instrumentation, control systems, and calibration checks under annual 3 year service contracts.

014
TASNEE 2016 PO / Contract: 4500091913 Completed

System testing and calibration of fire alarms, ensuring accuracy and reliability during periodic checks and maintenance.

015
EAST GAS 2016 PO / Contract: EGCL/033/2016 Completed

Construction of NG pipeline networks and fiber optic cables Dammam 2nd Industrial City, supporting turnkey expansion projects of gas distribution for Saudi Arabian Amiantit Company

SabTank, tank terminal operator

016
TASNEE 2016 PO / Contract: 4800005507 Completed

As Built for Butanol Project , SabTank, tank terminal operator

017
SEPC (Saudi Ethylene and Polyethylene Company) 2016 PO / Contract: 5500060433 Completed

BMS software updates and system upgrades, improving energy efficiency and system performance during scheduled maintenance or upgrades.

018
TASNEE 2016 PO / Contract: 4500092863 Completed

RTR pipe installation using butt & wrap, key lock, and adhesive joint methods, ensuring reliable and durable pipeline connections.

019
Saudi Polyolefin Company 2016 PO / Contract: 5500060776 Completed

HVAC system maintenance including chillers, ducting, and package units, ensuring efficient climate control and system performance.

020
Saudi Acrylic Acid Company 2016 PO / Contract: 5500060641 Completed

Cable termination and glanding for LV/MV systems, ensuring secure connections and proper insulation.

021
TASNEE 2016 PO / Contract: 4500072622 Completed

Turnaround Manpower services in PDH Plant

022
TASNEE 2016 PO / Contract: 5500009448 Completed

Fabrication and erection of steel access platforms, ladders and handrails.

Repeat Order for Refinary operations.

023
TASNEE 2016 PO / Contract: 5500010086 Completed

Preventive maintenance and testing of power transformers.

024
TASNEE 2016 PO / Contract: 5500010675 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

025
TASNEE 2016 PO / Contract: 5500010673 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

026
TASNEE 2016 PO / Contract: 5500010123 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

027
TASNEE 2016 PO / Contract: 5500010044 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

028
TASNEE 2016 PO / Contract: 5500010035 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

029
TASNEE 2016 PO / Contract: 5500010034 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

030
TASNEE 2016 PO / Contract: 5500009878 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

031
TASNEE 2016 PO / Contract: 5500009835 Completed

Under Three-Year Long-Term ARC Contract at SABUCO

032
TASNEE 2016 PO / Contract: 5500009710 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

033
TASNEE 2016 PO / Contract: 5500009579 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

034
TASNEE 2016 PO / Contract: 5500009325 Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

035
TASNEE 2016 PO / Contract: 5500009295 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

036
TASNEE 2016 PO / Contract: 5500009289 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

037
TASNEE 2016 PO / Contract: 5500009161 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

038
TASNEE 2016 PO / Contract: 5500009119 Completed

Under Three-Year Long-Term ARC Contract at SAMCO

039
TASNEE 2016 PO / Contract: 5500009113 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

040
TASNEE 2016 PO / Contract: 4600004603 Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

001
Satorp 2015 PO / Contract: 27806 Completed

Detailed engineering and design for the installation of a new bypass control valve at the Crude Distillation Unit (CDU) of the SATORP Refinery

HK Al Sadiq

Project or partnership in mind?

Let us build the right engineering response.

Contact our team
WA