Ongoing Projects

Project/Contract: 3 Years Long Term ARC Contract Client 9000001104

Project/Contract: 3 Years Long Term ARC Contract Client 9000001104 : Rowad International Geosynthetics Co. Ltd.

Scope:  Provide Technical Services to Client

Read More
RC Corridor Piping As built Drawing Project

RC Corridor Piping As built Drawing Project

Read More
Nozzle and Venting Calculation for Farabi Tank

Project: Nozzle and Venting Calculation for Farabi Tank   Client: TAMIMI/ FARABI Petrochemicals

Scope: Design Calculations for Nozzle and tank Venting adequacy Check

Read More
Third Party Inspection COVID-19 Inspection

Project: Third Party Inspection COVID-19 Inspection   Client: SABIC   Scope: Conduct Third Party Inspection for Staff Accommodation for COVID-19

Read More
Extension of Natural Gas Pipeline From East gas to its Customers

Project: Extension of Natural Gas Pipeline From East gas to its Customers      Client: East Gas Company Limited

Scope: Detailed Engineering Package for NG Pipeline  (Process, Piping, Electrical, Instrumentation, Civil/Structural)

Read More
As Built Drawings

Project: As Built Drawings    Client: JANA Chemicals

Scope: Preparation of As Built Isometrics for JANA Pipelines in RC Corriddor

Read More
Future Tie In For Ethylene Cracker Expansion

Project: Future Tie In For Ethylene Cracker Expansion    Client: TASNEE

Scope: Engineering, Procurement and Construction (EPC)for Future Tie in's

Read More
Long Term ARC Contract

Project/Contract: Long Term ARC Contract Client 9000000962 : National Industrialization Company (TASNEE) 

Scope:  Provide Technical Services to Client

Read More