Selected experience

Completed Projects

Project/Contract: 3 Years Long Ter m ARC Contract Client 9000000418 : National Industrialization Company ( TASNEE)

01

Project Management Consultancy (PMC)

Project Management Consultancy (PMC) services and project information from COC Engineering.

View page ↗
02

Project Management Consultancy Services

Project Initiation Design Review Project Planning & Control Cost & Schedule Management Resource Management Procurement Expediting Risk Management

View page ↗
03

Infrastructure Master Planning & Smart City Solutions

• Project Management • Design Reviews • Construction Management • Construction Supervision • Owner’s Representative • Dispute Resolution

View page ↗
04

Project + Construction Management

• Project Management • Design Reviews • Construction Management • Construction Supervision • Owner’s Representative • Dispute Resolution

View page ↗
05

Urban Development Advisory

Integrated support for mixed-use development planning and supervision.

View page ↗
06

Regional Infrastructure Coordination

Transport infrastructure coordination and construction-stage consultancy.

View page ↗
07

Water Network Delivery Support

Engineering consulting for utility and network expansion initiatives.

View page ↗
09

Project/Contract: 3 Years Long Term ARC Contract Client 9000001104

Project/Contract: 3 Years Long Term ARC Contract Client 9000001104 : Rowad International Geosynthetics Co. Ltd. Scope: Provide Technical Services

View page ↗
10

RC Corridor Piping As built Drawing Project

RC Corridor Piping As built Drawing Project

View page ↗
11

Nozzle and Venting Calculation for Farabi Tank

Project: Nozzle and Venting Calculation for Farabi Tank Client: TAMIMI/ FARABI Petrochemicals Scope: Design Calculations for Nozzle and tank Vent

View page ↗
12

Third Party Inspection COVID-19 Inspection

Project: Third Party Inspection COVID-19 Inspection Client: SABIC Scope: Conduct Third Party Inspection for Staff Accommodation for COVID-19

View page ↗
13

Extension of Natural Gas Pipeline From East gas to its Customers

Project: Extension of Natural Gas Pipeline From East gas to its Customers Client: East Gas Company Limited Scope: Detailed Engineering Package fo

View page ↗
14

As Built Drawings

Project: As Built Drawings Client: JANA Chemicals Scope: Preparation of As Built Isometrics for JANA Pipelines in RC Corriddor

View page ↗
15

Future Tie In For Ethylene Cracker Expansion

Project: Future Tie In For Ethylene Cracker Expansion Client: TASNEE Scope: Engineering, Procurement and Construction (EPC)for Future Tie in

View page ↗
16

Long Term ARC Contract

Provide Technical Services to Client

View page ↗
17

Project/Contract: 3 Years Long Term ARC Contract Client 9000000418

Project/Contract: 3 Years Long Term ARC Contract Client 9000000418 : National Industrialization Company (TASNEE) Scope: Provide Technical Service

View page ↗
18

Third Party Inspection COVID-19 Inspection (Core Team)

Project: Third Party Inspection COVID-19 Inspection Client: Core Team Scope: Conduct Third Party Inspection for Staff Accommodation for COVID-19

View page ↗
19

Third Party Inspection COVID-19 Inspection (Al Rashid)

Project: Third Party Inspection COVID-19 Inspection Client: Al Rashid Scope: Conduct Third Party Inspection for Staff Accommodation for COVID-19

View page ↗
20

Third Party Inspection COVID-19 Inspection (WISON)

Project: Third Party Inspection COVID-19 Inspection Client: WISON Scope: Conduct Third Party Inspection for Staff Accommodation for COVID-19

View page ↗
21

Third Party Inspection COVID-19 Inspections

Project: Third Party Inspection COVID-19 Inspection Client: SABIC Scope: Conduct Third Party Inspection for Staff Accommodation for COVID-19

View page ↗
22

As Built Project, TASNEE

Project: As Built Project, TASNEE Client: TASNEE Scope: Prepare As Built Documentation for TASNEE SAPCO Project in SABTANK

View page ↗
23

Pipeline Cleaning , SADARA

Project: Pipeline Cleaning , SADARA Client: SADARA Scope: Maintenance and Cleaning of Pipelines

View page ↗
24

Site Development for Gulf Packaging and Trio Mada

. Project :Site Development for Gulf Packaging and Trio Mada Client: Gulf Packaging Scope: Detailed Engineering Package for Site Development of G

View page ↗
25

Steel Structure Maaden Phosphate, Ras Al Khair

Project: Steel Structure Maaden Phosphate, Ras Al Khair Client: Nasser Al Hajri/ Maaden Phosphate Scope: Preparation of Fabrication Drawings for

View page ↗
26

New Floating Pontoon For Coastal Guard, Petro Rabigh

Project: New Floating Pontoon For Coastal Guard, Petro Rabigh Client: Marine Services/ Petro Rabigh Scope: Preparation of Gasoline and Diesel Tra

View page ↗
27

Primary Skid Validation, Dammam

Project: Primary Skid Validation, Dammam Client: East Gas Company Limited Scope: Debottlenecking of the Primary Metering Skid From Aramco. The Sc

View page ↗
28

As Built Project, Dammam

Project: As Built Project, Dammam Client: East Gas Company Limited Scope: Prepare As Built Documentation for EAST GAS Natural Gas Line Network

View page ↗
29

Inspection of FRP Lines, Al Bayrouni

Project: Inspection of FRP Lines, Al Bayrouni Client: Al Bayrouni/ SABIC Scope: Conduct Inspection and Provide Recommendation s for FRP Lines

View page ↗
30

Concrete Repair & Inspection at Al Bayrouni

Project: Concrete Repair & Inspection at Al Bayrouni Client: Al Bayrouni/ SABIC Scope: Inspection and Repair of Civil Foundation for Al Bayrouni

View page ↗
31

Building Risk Assessment for Sabtank Facilities

Project: Building Risk Assessment for Sabtank Facilities Client: SABTANK/SABIC Scope: Conduct Building Risk Assessment Study for SABTANK Faciliti

View page ↗
32

Detailed Engineering for New Bypass Line for Control Valve

Project/Contract : New Bypass Line for Control Valve Engineering Design and Stress Analysis Client: HK Al SADIQ/ SATORP Scope: Detailed Engineeri

View page ↗

Project or partnership in mind?

Let us build the right engineering response.

Contact our team
WA